Laserfiche WebLink
<br />Table 2 details the status of the construction fund as of <br />December 31, 1983. Table 3 projects the status of the construc- <br />~ tion fund through FY 84-85. <br /> <br />The Colorado Water Conservation Board strongly urges the <br />General Assembly to repay to the construction fund in FY 84-85 <br />the $22.5 million which was transferred out. Failure to do so <br />will result in the deferral of projects to which the General <br />Assembly has previously committed funds. <br /> <br />Encls: Table 1 <br />Table 2 <br />Table 3 <br />project Summaries <br />Summit Reservoir <br />Monument Reservoir <br />Fruitgrowers Reservoir <br />Letter: Torp/Stroup to Strahle <br /> <br />. <br /> <br />~ <br /> <br />-3- <br />