My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00121
CWCB
>
Publications
>
Backfile
>
PUB00121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:20:39 PM
Metadata
Fields
Template:
Publications
Year
1983
Title
Construction Fund Annual Report 1983
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1983
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..... ,," <br /> <br />.. <br /> <br />A unique feature of this project is that the excavation for . <br />the reservoir would exceed the embankment fill by about 750,000 <br />cubic yards. This excess material would be placed on adjacent <br />land through an agreement between the city and the landowner. <br /> <br />A potential problem with subsidence could exist since the <br />reservoir lies over, an abandoned coal mine. This problem has <br />been addressed in a study by Chen and Associates, Inc., a soils <br />and foundation consultant. The results of this study indicate <br />that there will be no proble~. Further deep drilling will be <br />required to confirm this. <br /> <br />Due to the nature of this proj ect, it <br />construction could not begin before 1984. <br />cost at that time is $3,562,000. <br /> <br />is anticipated that <br />The total estimated <br /> <br />proposed Financing <br /> <br />The proposed funding for the project would be: <br /> <br />private funds (obtained by City) <br /> <br />$1,781,000 <br /> <br />CWCB funds (to be repaid by water user fees) <br /> <br />1,781,000 <br /> <br />Total <br /> <br />$3,562,000 <br /> <br />. <br /> <br />Under this financing arrangement, charges would be levied by <br />the CWCB at the rate of $103,797 per year for 40 years for a <br />total repayment of $4,151,880. <br /> <br />Recommendation <br /> <br />It is recommended that the project as described be recom- <br />mended by the Board to the General Assembly for authorization <br />subject to the terms of the proposed financing specified above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.