My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00120
CWCB
>
Publications
>
Backfile
>
PUB00120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:20:25 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
Small Project Loan Report
CWCB Section
Finance
Author
CWCB
Description
Construction Fund and Severance Tax Fund Perpetual Base Account
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />AQenda Item 25t <br /> <br />Union Ditch Company <br />Mard116-17,2004 <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Union Ditch Company (UDC) <br />Project Name: UDC Recharge Project <br /> <br />County: Weld <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $344,000 <br /> <br />Funding Sources: CWCS, UDC <br /> <br />Type of Borrower: Agricultural <br />ewes Construction Fund Loan: $309.500 <br /> <br />Aver. Delivery: 206 acre-feet (consump. use) <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />UDC operates the Union Ditch providing direct flow irrigation water to an area of 5,50D-acres east of <br />the To'NTl of laSalle and south of Greeley. Water is diverted from the South Platte River at a headgate <br />east of the Town of Milliken. UDC operates approximately 15 miles of ditch and typically delivers <br />about 29,000 acre-feet of irrigation water per year. UDC has filed an application for an <br />Augmentation Plan to provide replacement water for 40 junior wells owned by shareholders. <br />formerly serviced by GASP, to replace out-of-priority irrigation well depletions. As part of the <br />Augmentation Plan UDC will need 50 AF of developed recharge storage capacity to offset the <br />depletions. The project involves the development of three recharge structures. with the top priority <br />site, the Mecure #1 Site (20 AF) developed initially in 2004. and the remaining two sites totaling 30 <br />AF developed in 2005. Each pond would be filled by water that is diverted from the Union Ditch. <br />The construction of each site will include pond excavation. flow measurement structures (flumes on <br />feeder canals or meters for pumps). headgate structures for feeder canals, and monitoring and <br />reporting measurement equipment (SCADA). The ponds will be relatively shallow in depth (< 10 <br />feet) and will include an earthen embankment around the perimeter of the pond. <br /> <br /> <br />. <br /> <br />. <br /> <br />- <br /> <br />~ <br />~ <br /> <br />." <br /> <br />-- <br /> <br />. <br />. <br /> <br />. <br />. <br /> <br />/ <br />1- <br /> <br />: __::C:_ <br /> <br />Location Map <br /> <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.