My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00120
CWCB
>
Publications
>
Backfile
>
PUB00120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:20:25 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
Small Project Loan Report
CWCB Section
Finance
Author
CWCB
Description
Construction Fund and Severance Tax Fund Perpetual Base Account
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Pinewoocl Springs Water District <br />July2o-Z1.2004 <br /> <br />Il.genda Item 14e <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Pinewood Springs Water District <br />(PSWD) <br />Project Name: Drought Mitigation Project <br /> <br />County: Larimer <br /> <br />Drainage Basin: South Platte <br /> <br />Project Type: New Reservoir/Pipe LinelWater <br />Rights Purchase <br />Water Source: Little Thompson River, CST <br /> <br />Total Project Cost: $2,711,805 <br /> <br />Funding Sources: cwes, CWRPDA, PSWD <br /> <br />Type of Borrower: Municipal (Middle Income) <br /> <br />Aver. Delivery: 51 acre-feet <br /> <br />cwcs Loan: $2,033,850 <br /> <br />Interest Rate: 4.00% Tenn: 30 years <br /> <br />-."" <br />I ) <br /> <br />PSWD is located 11 miles east of Estes Park on US 36, and provides water to 268 taps with a <br />projected total of 350 taps at build-out. They draw surface water from the Little Thompson River <br />and treat it with an existing micro-filtration unit. PSWD has no raw water storage. and has been <br />severely impacted by water shortage in the past several years, spending about $180,000 to haul <br />water purchased from the City of longmont. They are in need of a reliable and continuous supply <br />of raw water. Also, in 2002 the Big Elk fire consumed thousands of acres above upstream of <br />PSWD on the little Thompson River, resulting in a considerable amount of ash and other fire <br />related debris. This has caused severe plugging of the infiltration gallery and contamination of the <br />micro-filtration units. Subsequently, a number of planning studies have identified a several water <br />needs. In summary, the proposed project will provide the following raw water components: <br />construction of the 51 acre foot Crow lane Reservoir #1 (35 foot high dam with outlet works and <br />emergency spillway meeting State dam design requirements), a new pump station. about 5500 If of <br />6w PVC draw and fill transmission piping, modifications to the infiltration gallery intake, as well as <br />the purchase of as many as 90 CBT water shares to provide a reliable water source for the <br />reservoir. In addition. with the assistance of a DWRF loan. PSWD will add an additional micro- <br />filtration treatment unit and replace about 4000 If of distribution piping. not part of the CWCS loan. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />- <br /> <br />Location Map <br />Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.