Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />Pipeline to Juniata Dam <br />City of Grand Junction <br />January, 1989 <br /> <br />Introduction <br /> <br />In order to provide an adequate supply of treated water on <br />peak use days, the City of Grand Junction has embarked on a <br />program to: (1) increase the carrying capacity of existing <br />diversion facilities, (2) enlarge an existing raw water storage <br />reservoir, and (3) construct an interconnecting raw water <br />pipeline between the above mentioned enlarged reservoir and the <br />city's existing raw water transmission facilities. The city <br />has asked for financial assistance on item (1) above. This <br />proposed project would be located on Purdy Mesa, 17 miles <br />southeast of Grand Junction. <br /> <br />Problem <br /> <br />The city currently has diversion rights for 28.37 cfs from <br />the North Fork of Kannah Creek to its storage reservoir. <br />However, the existing diversion facility only has a capacity of <br />5-6 cfs. In order to improve the yield of its system, the city <br />must increase the capacity of its diversion facility. HDR <br />Infrastructure, Inc., prepared a feasibility report on how best <br />to accomplish this task. That report is the basis for the <br />recommendation on this project. <br /> <br />Proposed Proiect <br /> <br />The consultant's recommendation is to replace the existing <br />facilities with a 6000 foot - 30 inch diameter ductile iron <br />pipe and appurtenances. This new pipeline would convey the <br />city's water from the North Fork of Kannah Creek to Juniata <br />Reservoir. The total estimated cost of the project is $500,000. <br /> <br />Proposed FinancinQ <br /> <br />City of Grand Junction (Local <br />Affairs grant and city reserves) <br />CWCB loan at 5 percent, 25 years <br />Total <br /> <br />$250,000 <br /> <br />250,000 <br />$500,000 <br /> <br />Under the proposed financing arrangement, the city would <br />pay the CWCB $17,737.50 per year for 25 years, for a total <br />repayment of $443,437.50. <br /> <br />8982E <br />