My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00101
CWCB
>
Publications
>
Backfile
>
PUB00101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:17:18 PM
Metadata
Fields
Template:
Publications
Year
1994
Title
Fort Lyon Canal Company Water Transfer Alternatives Study - Final Report
CWCB Section
Finance
Author
Gronning Engineering
Description
Analysis of the alternative approaches to, and the results of the transfer of agricultural water supplies from the Ft. Lyon Canal Company to alternative uses
Publications - Doc Type
Brochure
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 3.2 Horse Creek Reservoir Water Rights <br /> <br />1. Priorities for its original construction (11,400 acre-feet) are: <br />Priority Date Flow Rate Source . <br />August 14, 1900 2,000 cfs Horse Creek <br />January 25 1906 840 cfs Arkansas River <br />March 1, 1910 1,466 cfs Arkansas River <br /> <br />2. For the first enlargement (15,487 acre-feet), the priorities are: <br />Priority Date Flow Rate Source <br />January 25,1906 840 cfs Arkansas River <br />December 20, 1907 5,000 cfs Horse Creek <br />March 1, 1910 1,466 cfs Arkansas River <br /> <br />3. For the second enlargement (1,113 acre-feet): <br />Priority Date Flow Rate Source <br />June 12, 1908 5,000 cfs Horse Creek <br />June 12, 1908 840 cfs Arkansas River <br />March 1, 1910 1,466 cfs Arkansas River <br /> <br />Adobe Creek Reservoir. Total decreed capacity of 87,000 acre-feet which can be supplied from the <br />Arkansas River through the Ft. Lyon Storage Canal or from Adobe Creek. These rights are <br />presented in Table 3.3. <br /> <br />Table 3.3 Adobe Creek Reservoir Water Rights <br />1. Priorities for its original construction (61,575 acre-feet) are: <br />Priority Date Flow Rate Source <br />January 25, 1906 8,631 cfs Adobe Creek <br />January 25, 1906 840 cfs Arkansas River <br />March 1, 1910 1,466 cfs Arkansas River <br />2. For the first enlargement (25,425 acre-feet), the priorities are: <br />Priority Date Flow Rate Source <br />December 29, 1908 8,631 cfs Adobe Creek <br />December 29, 1908 840 cfs Arkansas River <br />March 1, 1910 1,466 cfs Arkansas River <br /> <br />3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.