My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00092
CWCB
>
Publications
>
Backfile
>
PUB00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:16:19 PM
Metadata
Fields
Template:
Publications
Year
1975
Title
Construction Fund Annual Report 1975
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1975
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />PRELIMARY' COST ESTIMATE (continued) <br /> <br />Item <br /> <br />Quantity <br /> <br />Amount <br /> <br />Unit <br /> <br />Uni t I?rice <br /> <br />,6. Phase Two Construction: <br /> <br />Intake improvements. <br /> <br />24-inch raw water transmission <br />pipeline. 2,000 <br /> <br />Sedimentation basin and <br />raw water reservoir. 180,000 <br /> <br />4 m.g.d. treatment plant, <br />complete. <br /> <br />24-inch treated water <br />transmission pipeline <br /> <br />2,000 <br /> <br />lump <br /> <br />feet <br /> <br />40.00 <br /> <br />$ 20,000.00 <br /> <br />80,000.00 <br /> <br />1<50,000.00 <br /> <br />600,000.00 <br /> <br />80,000,00 <br /> <br />Total Estimated Phase Two Construction Cost................. $1,230,000.00 <br /> <br />7. Treatment plant site <br />land acquisition <br /> <br />40 <br /> <br />8. Lega 1 fees <br /> <br />9. Bonding fees <br /> <br />10. Engineering and Inspection fees <br /> <br />11. Contingencies <br /> <br />cu. yd. <br /> <br />2.50 <br /> <br />400,000.00 <br />61,500.00 <br />61,500.00 <br /> <br />104,550.00 <br /> <br />184,500.00 <br /> <br />Total Estimated Phase ~ COst.."'.,;.........."...o.............$2.042tOSO.OO <br /> <br />lump <br /> <br />feet <br /> <br />40.00 <br /> <br />Total Estimated Project COst.................................$2,720,OOO.OO <br /> <br />-8- <br /> <br />acres 10,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.