My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00092
CWCB
>
Publications
>
Backfile
>
PUB00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:16:19 PM
Metadata
Fields
Template:
Publications
Year
1975
Title
Construction Fund Annual Report 1975
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1975
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Retirement of the capital investment together with operation and <br />maintenance charges could be achieved by imposing a water use charge <br />of about $0.32 per thousand gallons. This is a reasonable charge and <br />well within the capability of the city of Gunnison to impose and collect. <br />RECOMMENDATION AND PRIORITY <br />It is recommended that an appropriation in the sum of $350,000 for <br />fiscal year 1975-76 be sought from the Colorado General Assembly to <br />enlarge the municipal water system of the city of Gunnison in accordance <br />with the explanation heretofore set forth. <br />The city of Gunnison does have a critical need to enlarge its <br />municipal water system at the earliest possible date. However, it is <br />not believed that this need is as critical at this time as the situ- <br />ations in Allenspark and Meeker. It is therefore recommended that the <br />Gunnison project be accorded the third priority for construction under <br />authority of the Colorado Water Conservation Board Construction Fund. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.