Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: <br /> <br />North Poudre lnigation Company <br /> <br />Project:'\ame: <br /> <br />System Rehabilitation <br /> <br />Project Type: Dam Rehab. <br /> <br />Count)": <br /> <br />Larimer <br /> <br />Drainage Basin: S. Platte <br /> <br />Water Source: Cache La Poudre <br /> <br />Total Project Cost: <br /> <br />$1.896.960 <br /> <br />Funding Sources: Company and CWCB <br /> <br />Type of Borrower: <br /> <br />MunicipaVAg <br /> <br />Median Household Income: <br /> <br />N/A <br /> <br />1998 eWeB Loan: <br />1999 eWeB Loan: <br /> <br />$ 500,000 <br />$1,107,000 <br /> <br />Interest Rate: 4.03% <br />Interest Rate: 4.04% <br /> <br />Term: 20 years <br />Term: 20 years <br /> <br />Annual Volume of Water de-tinred: 200 acre-feet <br /> <br />This project is located in Larimer County, 10 miles north ofFon Collins. The borrower is an agricultural <br />imgation company serving 685 shareholders within a 30,OOO-acre service area. The project is needed <br />because North Poudre Reservoir #5 has an madequate spillway, and because m'o company ditches are <br />eroding badly, threatening adjacent farmland and county roads. Smith Geotechnical Engineers has <br />completed the feasibility study and initial design. The project will consist of constructing an emergency <br />spillway and placing [\\'0 open ditches with pipe. Construction is scheduled to start 10 March of 1998 and <br />be completed by OClober 1998. Funding sources include a CWCB loan and a special assessment of the <br />shareholders. <br /> <br /> <br />- <br />~ <br /> <br />:IN-,.,,,,, ~::-I <br />....t:;.'. """"iJ I ....~ <br /> <br />Location .Map <br />