Laserfiche WebLink
<br />FY 95-96 <br /> <br />FY 96-97 <br /> <br />FY 97-98 <br /> <br />FY 98-99 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4,5 Loan Disbursements <br /> <br />A (alaI of 519.5 million in disbursements from the Construction Fund wefe made for <br />construction projects. non.reimbursable projects. and investigations in (he calendar <br />months of FY 99. The following bar charl shows annual disbu~ements from FY94 <br />through FY99. <br /> <br />CWCB Construction Fund <br />ANNUAL LOAN DISBURSEMENTS <br /> <br /> 30 <br /> 25 <br /> 20 <br />" <br />c: <br />.2 15 <br />:E <br /> 10 - <br /> 5 <br /> 0 <br /> FY 94-95 <br /> <br />-22.44- - <br /> <br /> <br />4.6 Completed Construction Project Loans <br /> <br />The ewes Construction Fund was established by the General Assembly in 1971 10 <br />provide low interest. long-term loans [0 waler users for the development of water <br />projects. The first project was completed in 1977. By the end of FY98. the fund <br />provided over SloW million in loan financing for 190 waler projects. A list of the <br />completed projects financed through loans from the Construction Fund is shown in <br />Appendix A. <br /> <br />Sixteen CWCS Construction Fund loans represenling over S~O.I ~ million. as shown <br />In the following table. were completed In FY 99. Additional details aboul these <br />completed projeclloans are located in Appendix B. <br /> <br />CWCB FYlN ..\nnu.J1 Repon. p.Jge ~6 <br />