My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00082
CWCB
>
Publications
>
Backfile
>
PUB00082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:55 PM
Metadata
Fields
Template:
Publications
Year
1978
Title
Construction Fund Annual Report 1978
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1978
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />1.2 million gallon buried concrete water reservoir and a new trans- <br /> <br />mission line to the new reservoir. In order to provide a supplemen- <br /> <br />tal source to accommodate the current and expected growth, they <br /> <br />recommend that two wells be developed in the Roaring Fork River <br /> <br />alluvium and that a pump station and transmission line from the <br /> <br />pump station to the existing system be constructed. Finally, the <br /> <br />consultants recommend that universal metering be installed and that <br /> <br />the usage rate be increased in order to conserve water in future <br /> <br />years. In conjunction with the new well field, the plan includes a <br /> <br />specific sum for a water rights acquisition program. The total <br /> <br />estimated cost for the project is $1,210,000. <br /> <br />RECOMMENDATION AND PRIORITY <br /> <br />The residents of Basalt are currently faced with water short- <br /> <br />ages during peak-demand periods, and they have three annexations <br /> <br />pending that will make these shortages much more severe. The pro- <br /> <br />posed project will solve the problem. <br /> <br />The town can fund approximately $200,000 of the total project <br /> <br />cost, and they anticipate being able to obtain a $200,000 FmHA grant, <br /> <br />a $120,000 Four Corners Regional Commission grant, and a $90,000 <br /> <br />FmHA loan. <br /> <br />The proposed financing is therefore as follows: <br /> <br />Local Funds <br /> <br />$ 200,000 <br /> <br />Federal Grants and Loans <br /> <br />410,000 <br /> <br />. <br /> <br />state Funds (to be repaid <br />by water use charges <br /> <br />600,000 <br /> <br />Total <br /> <br />$1,210,000 <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.