My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00081
CWCB
>
Publications
>
Backfile
>
PUB00081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:54 PM
Metadata
Fields
Template:
Publications
Year
1976
Title
Construction Fund Annual Report 1976
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1976
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Retirement of the capital investment together with operation and <br />maintenance charges could be achieved by imposing a water use charge <br />of about $0.32 per thousand gallons. This is a reasonable charge and <br />well within the capability of the city of Gunnison to impose and collect~ <br />RECOMMENDATION AND PRIORITY <br />The city of Gunnison has a critical need to enlarge its municipal <br />water system at the earliest possible date. This project was considered <br />by the board in 1975 and was awarded priority number three. The other <br />two projects recommended by the board during 1975 (Allenspark and <br />Meeker) have been funded and are now under construction. The Gunnison <br />project will therefore have to be awarded a new priority, <br />It is the staff recommendation that the Gunnison project be recom- <br />mended for construction as priority number one and so submitted to the <br />Colorado General Assembly during the 1976 session. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.