My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00081
CWCB
>
Publications
>
Backfile
>
PUB00081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:54 PM
Metadata
Fields
Template:
Publications
Year
1976
Title
Construction Fund Annual Report 1976
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1976
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ , <br />I <br /> <br />storage tank" The total cost of this plan is estimated at $271,000. <br />It is proposed that this board construct a portion of the project <br />at a cost of $60,000. This cost would be recovered through annual <br />service charges of $1,500 for a period of forty years. <br /> <br />RECOMMENDATION AND PRIORITY <br /> <br />The standard of living in the Greetville-Carbondale area can be <br />improved greatly if domestic water can be supplied to the individual <br />homes" The proposed project at the best is only marginally economically <br />feasible" Even with state construction of a portion of the project, a <br />substantial grant from other sources will be required. It is possible <br />that such grant could be secured with active state assistance. It is <br />therefore the suafforecommendation that the project be recommended for <br />construction as set forth herein as priority number four and thus sub- <br />mitted to the Colorado General Assembly during the 1976 session. <br /> <br />FLS:mm <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.