<br />DOMINGUEZ (Continued)
<br />
<br />Physical Facts and Figures:
<br />
<br />Dominguez Dam -
<br />. HeIght
<br />Crest length
<br />Crest width
<br />Volume
<br />Total capacity .
<br />Surface area
<br />Average annual power
<br />generation
<br />
<br />171 feet
<br />1,170 feet
<br />30 feet
<br />3,000.000 cubic yards
<br />302,000 acre-feet
<br />5,000 acres
<br />
<br />136,000,000 Kwh
<br />
<br />Rim Basin Reservoir -
<br />
<br />'230 teet
<br />8,220 feet
<br />. 25 feet
<br />n,ooo,ooo cubic yards
<br />.. .9,874 acre-feet
<br />137 acres
<br />
<br />Height
<br />Clest length
<br />Crest width
<br />Volume
<br />. Total capacity
<br />Surface area
<br />Average annual power
<br />generation ..620,OOO,oooKwh
<br />
<br />Population 10 be served: Municipal and industrial waler
<br />would be supplied to about 100,000 people, Base/oed
<br />power would be supplied to about 75,000 people while
<br />peaking power would be supplied to a quite large number.
<br />of users, .
<br />
<br />I r"gated acres to be served: NI A
<br />
<br />Estimated cost $330,000,000 (Appraisal level 1978'&"'t)
<br />
<br />Construction Schedule: NlA, Draft .Feasibility RepOrtand
<br />Draft Environmental Impact Stalement - 1981
<br />
<br />Proposed Sources, of Funding:
<br />Federal.
<br />
<br />For Further InfoFm.UOll Contact"
<br />
<br />J. F. Rinckel; Projects Manager......
<br />Waler and Power Resources Service, .
<br />764 Horizon Drive, Grand Junction CO 81501
<br />. '
<br />2~. .. ",.
<br />
<br />,.
<br />
<br />,J . '.' < ~ 0', l', r. .
<br />
<br />SANMIGUEL
<br />
<br />Location:
<br />Upper Colorado River Basin in Montrose and San Miguel
<br />Counties of Southwestern Colorado.
<br />
<br />Sponsors: '''.
<br />San Miguel Waler Conservancy District and Southwest.
<br />Watar, Conaervation District.
<br />
<br />... Primary PUfpose of the Project:
<br />Irrigation. Munic~ and.lnduatriB:l WaterSupply,
<br />
<br />Secondary Benefits:
<br />Recreation. Ash and Wildlife and Flood Control,
<br />
<br />History and Background:
<br />
<br />Planning for the San Miguel Project has been carried out
<br />at various times since the early 1900's. '
<br />
<br />When the project was authorized for construction in 1968,
<br />it was contemplated to serve approximately 39,000 acres
<br />and provide 44,000 acre-feet/year of municipal and in-
<br />dustrial water,
<br />
<br />Advanced planning studies began In '1971' and were
<br />suspended in 1973 by the salinity impacts moratorium,
<br />and as a result, a significant portion of the Irrigation
<br />service area was deleted from the project. MunIcipal and
<br />industrial waler demand projections have also been
<br />significantly reduced.
<br />
<br />To date, a feasible plan (benefits exceeding costs) has not
<br />been Identified. Economic problems associated with the
<br />altemative plans include high construction cost of
<br />highway relocations, high operation and mainlenance
<br />costs including power costs for pumping, high distribu-
<br />tion costs due to dispersed Irrigation service area, and
<br />limited rep'ayment capability,
<br />
<br />The Water and Power Resources Service has met several
<br />
<br />. :.;' "',.<'-~ ~,,,'
<br />
<br />times with the San Miguel Watac. Conservancy District
<br />during the pastfew months to attempt to identify a feasible
<br />plan, These attempts heve been unsuccessful. The fUture
<br />of the San Miguel Project Is pnisently llnc8rteln, ..'ft.
<br />. "'. . ". . . . ..~.
<br />Althoulih a feasible plan cannot be ldentlfled.' the . data
<br />presented In this project summary represent those alter-
<br />native plans that ant most IlMI1y fe8sib/e. .''-' :,.,..,~. ",.
<br />
<br />Physical Facts and Figures:
<br />
<br />. tieight, le!tgth and type Ilf dam: 200_ a59 feet; 8arth
<br />fill ".,.... ,"' . ... ,. "
<br />
<br />Storage capacity (A.F.) of re5erwlr: Total capaclty Is
<br />22,300 acre feet " . . . ' ..
<br />Shoreline and surface area: 7 rriiles shoreline; 336 acres
<br />Average annual power generation: NI A
<br />Population to besel'lled: 1,000 in year 1990: 1.800 in year
<br />2030
<br />Irrigated acres to be served: 19,760 acres
<br />Estimated cost $140,000,000 (January 1979 price level)
<br />Construction schedule: 6 years
<br />Proposed Sources of Funding:
<br />The San Miguel Project was authorized for construction
<br />by the Colorado River Basin Act of September 30, 1968,
<br />(Public Law 90-537) as a participating project under the
<br />Colorado River Storage Project Act of April 11, 1956,
<br />
<br />For Further InformaUon Contact
<br />
<br />Frank "Sam" Maynes; Counsel
<br />Southwestern Water Conservation District,
<br />p,O, Box 475, Durango, CO 81301
<br />247-1302
<br />
<br />3