|
<br />DALLAS (Continued from page 5).
<br />Physical Facts and Figures:
<br />, /
<br />Ridgway Dam (feet)
<br />Height above streambed
<br />Crest length
<br />
<br />227
<br />2,430
<br />
<br />,
<br />Ridgway Reservoir - Capacity (A,F.)
<br />ActIve '
<br />l!18ctive
<br />Total
<br />Water surface area (acres)
<br />,Total pool
<br />Inactive pool
<br />
<br />Project supply (avg. A,F. annually)
<br />Irrigation
<br />,Municipal use
<br />Ught Industrial usa
<br />Recreation usa
<br />Total
<br />
<br />55.000
<br />25,000
<br />80,000
<br />1,030
<br />525
<br />
<br />11,200
<br />22,600
<br />5.500
<br />100
<br />39,400
<br />
<br />Irrigation Service Area
<br />Dallas Creek exchange and
<br />Colona areas (acres)
<br />Uncompahgre Project area (acres)
<br />Area serviceable with Dallas
<br />Creek Project water
<br />Acreage within sert'iceable area
<br />likely to receive Dallas Creek
<br />Project water
<br />
<br />2,850
<br />
<br />61.810
<br />
<br />18.000
<br />
<br />Population to be served: An estimated 95.000 people WIll
<br />receive project municipal and Industrial water by the year
<br />2000, There are about 2,350 farm ownerships in the project
<br />area, Not all of these would receive project water, but until '
<br />subscriptions are made the exact number of recipients
<br />. cannot be determ Ined.
<br />Estimated Cost
<br />Construction costs (October 1979) '$72,977,000
<br />Annual operation, maintenance and
<br />replacement costs ' $410,000
<br />
<br />Construction Schedule: A 5-year program is planned.
<br />Construction is expected to be completed In 1983.
<br />
<br />" Proposed Source of Funding:
<br />
<br />Federal.
<br />
<br />For Further Information Contact
<br />
<br />J, F, Rinckel; Projects Manager
<br />Water and Power Resources Setvlce,
<br />764 Horizon Drive, Grand Junction, CO 81501
<br />243-4992 '
<br />
<br />YELLOW JACKET (Continued from pege 7)
<br />
<br />oil shale, 35,000 acre-feet for coal, ,26,000 acre-feet for
<br />",lgation and 5,000 acre-feet for municipal use, Extensive
<br />fish and wildlife measures were Included, The greatest
<br />single addition to the plan was the addition of Sawmill
<br />Mountain Reservoir, with a <;8pacity of 55,000 acre-feel.
<br />
<br />The Project is now improved and designed to meet
<br />objection to earlier plans which have been voiced over the
<br />past twenty years, Plans are now substantially complete.
<br />Environmental work has been done. The Yellow-Jacket
<br />Project is ready to meet the needs of an oil shale industry
<br />in north-west Colorado, and to supply agricultural.
<br />
<br />domestic and municipal needs in the upper White River
<br />Valley; , ,
<br />
<br />Physical Facts and FIgures:
<br />
<br />For the Sawmill Mountain Reservoir segment ,of the
<br />project - , .
<br />Height, length and type of dam': 375 H, 1,650 'L
<br />
<br />Storage capacity (A.F,) of reServoir: 55.000 acre-feet
<br />
<br />Shoreline and surface area: Surface area "- 450 acres
<br />
<br />Average annual power generation: NIP.
<br />
<br />, Population to be served: around .3,000; area growing
<br />rapidly ,
<br />
<br />Irrigeted acres to be served: 11,940 aeres
<br />
<br />E~imated cost $96,820,000 (1980 figure)
<br />
<br />Construction schedule; To begin in 1983 .
<br />
<br />Proposed Sources of Funding:
<br />This project will be- built either by the Water and Power
<br />Resources Service or by private industry acting through
<br />the District
<br />
<br />For Further InformaUon Contact
<br />
<br />Frank G. Cooley; Secretary-Counsel .
<br />Yellow-Jacket Water Conservancy District,
<br />P.O, Box 98, Meeker, CO 81641
<br />878-5065
<br />
<br />ANIMA$-LA PLATA (ContinUed from page 9)
<br />
<br />Physical Facts and Figures:
<br />
<br />Ridges 8uln S. Ute
<br />
<br />170' "
<br />2900
<br />earth
<br />1:0.000
<br />12,5 '
<br />1,386 acres
<br />
<br />313
<br />1600
<br />earth
<br />289,000 .
<br />.19,5
<br />2. 170 acres
<br />
<br />Height, feel
<br />Length. feet
<br />Type of Dam
<br />~orage Capacity (A.F,)
<br />Shoreline, miles
<br />Surface area
<br />Average annual power
<br />generation
<br />Population to, be served
<br />Colorado .
<br />New Mexico
<br />ToW
<br />Irrigation Acres. to be
<br />served -
<br />Colorado
<br />New Mexico
<br />Total
<br />Estimated cost - $406,000,000
<br />(January, 1980, price level)
<br />Construction schedule: 10 years
<br />
<br />none
<br />li!!Q
<br />28.700
<br />116,500
<br />145,200
<br />
<br />61,470
<br />~~.
<br />
<br />2020
<br />, 53.000
<br />266.700
<br />, . 319,700
<br />
<br />Proposed Sources of Funding:
<br />
<br />The Animas-La Plata Project was authorized for construc-
<br />tion by the Colorado River Basin Act of September 30,
<br />1968. (Public Law 90-537) as a participating project under
<br />the Colorado River Storage Project Act of April 11, 1956,
<br />
<br />For Further InformaUon Contact
<br />
<br />Frank .Sam" Maynes; Counsel
<br />Southwestern Water Coniervatlon District,
<br />P,O, Box 475, Durango, CO 81301
<br />247-1302
<br />
<br />1.
<br />
|