|
<br />WESTi:)IVIDE (Coirtln_N. ..'. ,.' ..... .
<br />, ',- "'-,' P','" '<_-''',' - '-J. __':_' -, _,," "-,' :'" '," >
<br />reecopecI the project and dlffei'ent water sOurces were
<br />. lde~~lled. .,....'.. '..' '.' ;':>".. ,. .' ..' '.' .' .,' .".
<br />: The Draft Oeflnlte f'Iait R8pOrt is' scheduled for mid-
<br />calendar year 1980. The Dra1l Environmental' Impact
<br />Statliment arid public hearings are due In late calendar
<br />year 1980 and the Final Environmental Impact Statement
<br />in early calendar year 1981,
<br />Water for the project would be 'obtained mainly by
<br />,pumping from the Colorado River Mar the town of Silt.
<br />This water plus water from East and West Divide Creaks
<br />would lie distributed. throughout the service' area by a
<br />system of four project canals and the necessary lateral
<br />systems. Two reservoirs would be constructed, one on
<br />West Divide Creek (Kendig Rese<volr) above tha project .
<br />. service area and theS8COnd (Ory Hoflow RMe(voig ~n '.
<br />the Irrlgatlon service area, Additional municipal water
<br />would be Ill8de' available from Beaver and Battlement
<br />Creeks by exchenging present Irrigation supplies In those
<br />stAlBITlS with water from Cache Creak Canal. Diversion
<br />and distribution of this water would be the responsibility of
<br />the water users, Recreational developments would be
<br />provided at both project reservolrs.lste nlllOn pumping
<br />from the Colorado River would be supplied by raieases
<br />from Green Mountalit ~Ir, an existing feature of the
<br />Coionld~lg Thompson Project.
<br />, '-. - -,' .
<br />Physical Facts and ~Igures:
<br />
<br />Dams -
<br />Haight above streambed (11)
<br />Crest length (It)
<br />Type
<br />
<br />Kendig
<br />202
<br />1.530
<br />ear1hfill
<br />
<br />Dry
<br />HGIow
<br />171
<br />2,195
<br />earthfill
<br />
<br />Reservoirs -
<br />Capacity (A.F ,)
<br />Active .
<br />Dead and Inactive
<br />Total
<br />Surcharge
<br />
<br />16.840
<br />,.~
<br />18,060
<br />.3,290
<br />
<br />19,100
<br />4,300
<br />23.400
<br />l.6llO
<br />
<br />
<br />WBter surface"~ (Beres)
<br />Total pool.' ,
<br />Inactive pool .
<br />. Shorailne (miles) ,
<br />Dlverslorl dams -
<br />Spillway crest length (It)
<br />DIversion capacity (cfs)
<br />Pumping Plants -
<br />, Divide Creek
<br />Dry Hoflow
<br />Unit No. 1
<br />Unit NO.2
<br />West Divide
<br />,->':
<br />Canals ~
<br />
<br />270
<br />'.,54 >..
<br />. 4.9
<br />
<br />493
<br />157
<br />.. .5.6
<br />
<br />, ,',-;;.:1
<br />E. Dnfde. W'.DlwIda
<br />_ -~_' {~50~'-:" .'::'--"" .:. 60
<br />";,,60 '- . ',75,
<br />
<br />....;Uft .,~ Cap8cKy
<br />',(feel). ,..'(c:fs)
<br />'!l12 . 130
<br />
<br />60 105 .
<br />314 115
<br />420 10
<br />-
<br />LangttI ea....,
<br />(mllw) (m)
<br />11 130
<br />28' ,225
<br />9 " 1..15
<br />13 95
<br />A".AnnuIII eo .... ,\,
<br />....raupply .. ,. . ..... e
<br />(U.) (--.1
<br />14,000 3,610
<br />23 400 1Q.al.
<br />37:400 14, '19&
<br />~
<br />17,300 6,840
<br />6000' 1~:=
<br />~
<br />'60,700 . , 25,170
<br />,1,300
<br />400
<br />1,200
<br />800
<br />3.soo
<br />
<br />Dry Hollow Feeder Canal
<br />Cache Creek Canal
<br />. Hunter Mesa Canal
<br />. West Divide Canal
<br />
<br />Water Supply -
<br />
<br />Project Irrigation
<br />Surface irrigatiOn
<br />Full servlce . '
<br />Supplemental service
<br />. Subtotal
<br />Sprinkler Irrigation
<br />Full service
<br />Supplemental service
<br />Subtotal
<br />Tota/-
<br />Project Irrigation' .
<br />
<br />Municipal -
<br />Rural a_ south of Rifle
<br />Town of Parachute
<br />Battlement Mesa planned
<br />unit development
<br />Rural a_ SOUth of Slit
<br />Total
<br />
<br />Population to be seMld: Municipal and rural domestic
<br />_tat would be IIUpplIed to about 22.000 peaofe and about
<br />195 farmll would be supplied Irrigation wQIr.'
<br />
<br />" estimated Costs: Total Construction - $195,800,000.
<br />Annual operation. maintenance. and replacement coats
<br />(1977-79 prlcel) $470,000. .
<br />
<br />Construction Scheaule: AnB-year program would be
<br />needed for construction of all project features except the
<br />d rains, which would be constructed II needed lIft8.
<br />Irrigation water had been applied to the land and drainage
<br />deficlenclel noted.
<br />
<br />.. Proposed Sources of Funding:
<br />
<br />Federal, Basin Fund and Colorado River Storage Project..
<br />
<br />For Further Informatlon.Contact
<br />J, F: Rlnckel; Projects Manager
<br />Water and Power Resources ServIce,
<br />764 Horizon Drive, Grand Junction. CO 81501
<br />243-4992
<br />
<br />11
<br />
|