Laserfiche WebLink
<br />WESTi:)IVIDE (Coirtln_N. ..'. ,.' ..... . <br />, ',- "'-,' P','" '<_-''',' - '-J. __':_' -, _,," "-,' :'" '," > <br />reecopecI the project and dlffei'ent water sOurces were <br />. lde~~lled. .,....'.. '..' '.' ;':>".. ,. .' ..' '.' .' .,' .". <br />: The Draft Oeflnlte f'Iait R8pOrt is' scheduled for mid- <br />calendar year 1980. The Dra1l Environmental' Impact <br />Statliment arid public hearings are due In late calendar <br />year 1980 and the Final Environmental Impact Statement <br />in early calendar year 1981, <br />Water for the project would be 'obtained mainly by <br />,pumping from the Colorado River Mar the town of Silt. <br />This water plus water from East and West Divide Creaks <br />would lie distributed. throughout the service' area by a <br />system of four project canals and the necessary lateral <br />systems. Two reservoirs would be constructed, one on <br />West Divide Creek (Kendig Rese<volr) above tha project . <br />. service area and theS8COnd (Ory Hoflow RMe(voig ~n '. <br />the Irrlgatlon service area, Additional municipal water <br />would be Ill8de' available from Beaver and Battlement <br />Creeks by exchenging present Irrigation supplies In those <br />stAlBITlS with water from Cache Creak Canal. Diversion <br />and distribution of this water would be the responsibility of <br />the water users, Recreational developments would be <br />provided at both project reservolrs.lste nlllOn pumping <br />from the Colorado River would be supplied by raieases <br />from Green Mountalit ~Ir, an existing feature of the <br />Coionld~lg Thompson Project. <br />, '-. - -,' . <br />Physical Facts and ~Igures: <br /> <br />Dams - <br />Haight above streambed (11) <br />Crest length (It) <br />Type <br /> <br />Kendig <br />202 <br />1.530 <br />ear1hfill <br /> <br />Dry <br />HGIow <br />171 <br />2,195 <br />earthfill <br /> <br />Reservoirs - <br />Capacity (A.F ,) <br />Active . <br />Dead and Inactive <br />Total <br />Surcharge <br /> <br />16.840 <br />,.~ <br />18,060 <br />.3,290 <br /> <br />19,100 <br />4,300 <br />23.400 <br />l.6llO <br /> <br /> <br />WBter surface"~ (Beres) <br />Total pool.' , <br />Inactive pool . <br />. Shorailne (miles) , <br />Dlverslorl dams - <br />Spillway crest length (It) <br />DIversion capacity (cfs) <br />Pumping Plants - <br />, Divide Creek <br />Dry Hoflow <br />Unit No. 1 <br />Unit NO.2 <br />West Divide <br />,->': <br />Canals ~ <br /> <br />270 <br />'.,54 >.. <br />. 4.9 <br /> <br />493 <br />157 <br />.. .5.6 <br /> <br />, ,',-;;.:1 <br />E. Dnfde. W'.DlwIda <br />_ -~_' {~50~'-:" .'::'--"" .:. 60 <br />";,,60 '- . ',75, <br /> <br />....;Uft .,~ Cap8cKy <br />',(feel). ,..'(c:fs) <br />'!l12 . 130 <br /> <br />60 105 . <br />314 115 <br />420 10 <br />- <br />LangttI ea...., <br />(mllw) (m) <br />11 130 <br />28' ,225 <br />9 " 1..15 <br />13 95 <br />A".AnnuIII eo .... ,\, <br />....raupply .. ,. . ..... e <br />(U.) (--.1 <br />14,000 3,610 <br />23 400 1Q.al. <br />37:400 14, '19& <br />~ <br />17,300 6,840 <br />6000' 1~:= <br />~ <br />'60,700 . , 25,170 <br />,1,300 <br />400 <br />1,200 <br />800 <br />3.soo <br /> <br />Dry Hollow Feeder Canal <br />Cache Creek Canal <br />. Hunter Mesa Canal <br />. West Divide Canal <br /> <br />Water Supply - <br /> <br />Project Irrigation <br />Surface irrigatiOn <br />Full servlce . ' <br />Supplemental service <br />. Subtotal <br />Sprinkler Irrigation <br />Full service <br />Supplemental service <br />Subtotal <br />Tota/- <br />Project Irrigation' . <br /> <br />Municipal - <br />Rural a_ south of Rifle <br />Town of Parachute <br />Battlement Mesa planned <br />unit development <br />Rural a_ SOUth of Slit <br />Total <br /> <br />Population to be seMld: Municipal and rural domestic <br />_tat would be IIUpplIed to about 22.000 peaofe and about <br />195 farmll would be supplied Irrigation wQIr.' <br /> <br />" estimated Costs: Total Construction - $195,800,000. <br />Annual operation. maintenance. and replacement coats <br />(1977-79 prlcel) $470,000. . <br /> <br />Construction Scheaule: AnB-year program would be <br />needed for construction of all project features except the <br />d rains, which would be constructed II needed lIft8. <br />Irrigation water had been applied to the land and drainage <br />deficlenclel noted. <br /> <br />.. Proposed Sources of Funding: <br /> <br />Federal, Basin Fund and Colorado River Storage Project.. <br /> <br />For Further Informatlon.Contact <br />J, F: Rlnckel; Projects Manager <br />Water and Power Resources ServIce, <br />764 Horizon Drive, Grand Junction. CO 81501 <br />243-4992 <br /> <br />11 <br />