My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00077
CWCB
>
Publications
>
Backfile
>
PUB00077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:26 PM
Metadata
Fields
Template:
Publications
Year
1987
Title
Construction Fund Annual Report 1987
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1987
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Colorado water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />Town of Frederick Water Project <br />(Town of Frederick) <br /> <br />Introduction <br /> <br />The Town of Frederick, which is located approximately 7 <br />miles southeast of Longmont, has requested assistance in <br />identifying and evaluating alternative raw water supply sources. <br /> <br />Problem <br /> <br />. <br /> <br />Frederick currently receives its raw water supply from <br />Boulder Creek via the lower Boulder Ditch, which diverts water <br />3 miles downstream of the Boulder Wastewater Treatment Plant. <br />The town has experienced difficulty in producing drinking water <br />of an acceptable quality due to taste and odor problems. In <br />order to resolve this problem, the town, with assistance from <br />the ewCB, conducted a feasibility study. The study was <br />performed by Rocky Mountain Consultants, Inc., of Longmont, and <br />is the basis for the recommendation on this project. <br /> <br />Proposed Proiect <br /> <br />The engineering consultant investigated three alternative <br />means of SOlving Frederick's water problems: (l) purchase of <br />water from the Central Weld Water District, (2) secondary <br />treatment of the current supply, (3) obtaining water out of <br />Boulder Creek above the Boulder sewage Treatment Plant. The <br />third alternative was selected. It would take water from <br />Boulder Creek above the sewage treatment plant and convey it <br />via the Boulder and Whiterock Ditch to Panama Reservoir. Water <br />would be pumped from that reservoir and conveyed via an eight <br />mile long pipeline to Frederick's existing raw water storage <br />reservoir (Milavec Reservoir). <br /> <br />Proposed Financinq <br /> <br />The proposed financing for this project is as follows: <br /> <br />Town of FrederiCk <br />(Bond issue and/or other sources) <br />CWCB loan <br /> <br />. <br /> <br />Total <br /> <br />$l,315,OOO <br />$1,315,000 <br />$2,630,000 <br /> <br />2416E <br />
The URL can be used to link to this page
Your browser does not support the video tag.