Laserfiche WebLink
<br />. <br /> <br /> Table I <br /> COLORAOO WATER CONSERVATION BOARD <br /> RECOMMENDED PROJECTS <br /> for 1988 <br /> Repayment Annual <br /> Location Total Period Interest Annual Total <br /> Priority Proiect Name (County) Cost 80ard Cost ill:hL Rate Payment Repayment <br /> Continental Dam Hinsdale $ 193,000 $ 193,000 30 5% $ 12,554.65 $ 376,639.50 <br /> and <br /> Santa Maria Dam (a) Mineral 261,000 261,000 30 5% 16,798.05 509,341.50 <br />, 2 Plateau Creek Pipeline 16,775,000 8,000,000 30 5% 520,400.00 15,612,000.00 <br />'" Mesa <br />0 <br /> 3 McCa 11 Lake Larimer <br /> Boulder 435,000 217 ,500 10 5% 28,166.25 281,662.50 <br /> 4 Ish Reservoir Boulder 72,000 36,000 20 5% 2,888.64 57,772.80 <br /> 5 R.C. Pipe Siphon Moffat 40.000 16.050 40 5% 935.40 37.416.00 <br /> $17.776,000 $8,723,550 $581,922.99 $16.874,832.30 <br /> <br />(a) The Board recommends that the rehabilitation of these two reservoirs, both of which are owned by the same company <br />and both of which are "pre-compact" reservoirs under the Rio Grande Compact. be viewed as a single project with the <br />first priority as among the projects to be authorized in 1988. <br /> <br />0069E-5 <br />