My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00076
CWCB
>
Publications
>
Backfile
>
PUB00076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:25 PM
Metadata
Fields
Template:
Publications
Year
1988
Title
Construction Fund Annual Report 1988
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1988
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />4 Ish . <br /> Reservoir 36,000 20 57,773 <br />5 R.C. Pipe <br /> Siphon 16,050 40 37,416 <br />6 Lake <br /> Loveland <br /> Outlet <br /> Works* 250,000 40 582,800 <br />7 Durango <br /> West Water <br /> Supply <br /> Project 408,000 40 951,130 <br />8 Onion <br /> Va 11 ey <br /> Dam** 300,000 40 699 , 360 <br />9 DeWeese Dye <br /> Ditch* 106,000 40 247,107 <br />10 Moonlight <br /> Lateral* 100,000 40 233,120 <br /> Totals $9,887,550 $19,588,350 . <br /> *The moneys for this project shall not be made available <br />by the board unt il the board has, in its sole discretion, <br />determined that the project is technically and fi nanc i ally <br />feasible. <br /> <br />**The board may loan up to $300,000 based on project <br />sponsors' financial need. The moneys for this project shall <br />not be made available by the board until the board has, in its <br />sole discretion, determined that the project is technically <br />and financially feasible. <br /> <br />(2) The Colorado water conservation board may make loans <br />for the construction of each project specified in subsection <br />(1) of this section from such moneys as are or may hereafter <br />become available to the Colorado water conservation board <br />construction fund, said loans to be in the amounts listed in <br />said subsection (1) plus or minus such amounts, if any, as may <br />be justified by reason of ordinary fluctuations in <br />construction costs as indicated by the engineering cost <br />indices applicable to the types of construction involved for <br />such projects or as may be justified by reason of changes made <br />in the plans for a project if those changes are required by <br />final engineering drawings and specifications or by federal or <br />state requirements. The board's loan for any project <br /> <br />11 <br /> <br />PAGE 2-SENATE BILL NO. 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.