Laserfiche WebLink
<br />,. <br /> <br />4 Ish . <br /> Reservoir 36,000 20 57,773 <br />5 R.C. Pipe <br /> Siphon 16,050 40 37,416 <br />6 Lake <br /> Loveland <br /> Outlet <br /> Works* 250,000 40 582,800 <br />7 Durango <br /> West Water <br /> Supply <br /> Project 408,000 40 951,130 <br />8 Onion <br /> Va 11 ey <br /> Dam** 300,000 40 699 , 360 <br />9 DeWeese Dye <br /> Ditch* 106,000 40 247,107 <br />10 Moonlight <br /> Lateral* 100,000 40 233,120 <br /> Totals $9,887,550 $19,588,350 . <br /> *The moneys for this project shall not be made available <br />by the board unt il the board has, in its sole discretion, <br />determined that the project is technically and fi nanc i ally <br />feasible. <br /> <br />**The board may loan up to $300,000 based on project <br />sponsors' financial need. The moneys for this project shall <br />not be made available by the board until the board has, in its <br />sole discretion, determined that the project is technically <br />and financially feasible. <br /> <br />(2) The Colorado water conservation board may make loans <br />for the construction of each project specified in subsection <br />(1) of this section from such moneys as are or may hereafter <br />become available to the Colorado water conservation board <br />construction fund, said loans to be in the amounts listed in <br />said subsection (1) plus or minus such amounts, if any, as may <br />be justified by reason of ordinary fluctuations in <br />construction costs as indicated by the engineering cost <br />indices applicable to the types of construction involved for <br />such projects or as may be justified by reason of changes made <br />in the plans for a project if those changes are required by <br />final engineering drawings and specifications or by federal or <br />state requirements. The board's loan for any project <br /> <br />11 <br /> <br />PAGE 2-SENATE BILL NO. 30 <br />