My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00076
CWCB
>
Publications
>
Backfile
>
PUB00076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:25 PM
Metadata
Fields
Template:
Publications
Year
1988
Title
Construction Fund Annual Report 1988
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1988
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Summary on Onion Valley Dam Project <br />(Gould Reservoir) <br /> <br />Introduction <br /> <br />Onion Valley Dam is located about six miles south of <br />Crawford and it is owned by the Fruitland Mesa Water <br />Conservancy District, Water stored behind this dam provides <br />irrigation water for 6,310 acres of land, <br /> <br />Problem and Proposed Project <br /> <br />In order to eliminate current water storage restrictions by <br />the State Engineers' Office the owners of the Gould Reservoir <br />must: <br /> <br />1, Repair the outlet work s <br /> <br />2. Replace a walkway to the control tower. <br /> <br />3, Replace the primary and secondary turnout structures <br />for the reservoir, <br /> <br />The estimated cost of this proposed project is $310,000. <br /> <br />Proposed Financinq <br /> <br />The requested financing by the owners is: <br /> <br />Fruitland Mesa Water <br />Conservancy District <br /> <br />$ 10,000 <br /> <br />Colorado Water <br />Conservation Board <br /> <br />300,000 <br />$310,000 <br /> <br />. <br /> <br />6257E <br />
The URL can be used to link to this page
Your browser does not support the video tag.