My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00076
CWCB
>
Publications
>
Backfile
>
PUB00076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:25 PM
Metadata
Fields
Template:
Publications
Year
1988
Title
Construction Fund Annual Report 1988
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1988
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Colorado Water Conservation Board <br /> <br />McCall Lake Dam Project <br />City of Longmont <br /> <br />December, 1987 <br /> <br />Introduction <br /> <br />McCall Lake is located four miles west of Longmont in <br />Boulder County. It is a raw water storage reservoir which is <br />owned by the City of Longmont. The reservoir has a capacity <br />of 506 acre-feet. Releases from this facility are primarily <br />used to irrigate city owned parks. <br /> <br />Problem <br /> <br />The State Engineer has advised the City of several <br />deficiencies which need to be corrected. The principal <br />deficiencies are: (1) erosion of the embankment, (2) erosion <br />of the spillway. and (3) non-operable outlet works. These <br />problems have all been addressed in a feasibility study <br />prepared by Rocky Mountain Consultants, Inc. of Longmont, <br />which study is the basis of the recommendation for this <br />project. <br /> <br />Proposed proiect <br /> <br />The consulting engineer's recommendation is to reconstruct <br />1,800 feet of the upstream face embankment. replace the <br />existing spillway, replace the existing outlet works, extend <br />the existing toe drain to a new outlet location. and construct <br />a new diversion structure on the outlet ditch from the <br />reservoir. The total estimated cost of this project is <br />$435,000. <br /> <br />Proposed Financina <br /> <br />The financing proposed for this project is as follows: <br /> <br />City of Longmont <br />CWCB loan at 5% interest <br /> <br />Total <br /> <br />$217.500 <br />217.500 <br />$435,000 <br /> <br />Under this financing arrangement. Longmont would have to repay <br />the CWCB $28,166.25 per year for lO years. for a total <br />repayment of $281,662.50. <br /> <br />5378E <br />
The URL can be used to link to this page
Your browser does not support the video tag.