Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />by June 30, 1985. Were the construction fund not entirely <br />restored by June 30, 1985, this could result in deferring the <br />initiation of projects which the General Assembly has previously <br />authorized. Table 2 gives details of the cumulative status of <br />the construction fund from its inception through December 31, <br />1984. <br /> <br />gl <br /> <br />Encls: Table 1 <br />~~e 2 <br />Project Summaries <br />Bauer No. 1 Reservoir <br />Beaver Park Water <br />Grandview Siphon <br />Florida Farm Irrigation <br />Louisville Reservoir <br />San Miguel WCD, Phase I <br />(Lone Cone Reservoir) <br />North poudre Reservoir No. 15 <br />San Miguel WCD, Phase II <br /> <br />-3- <br />