My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00074
CWCB
>
Publications
>
Backfile
>
PUB00074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:14:22 PM
Metadata
Fields
Template:
Publications
Year
1985
Title
Construction Fund Annual Report 1985
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1985
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />by June 30, 1985. Were the construction fund not entirely <br />restored by June 30, 1985, this could result in deferring the <br />initiation of projects which the General Assembly has previously <br />authorized. Table 2 gives details of the cumulative status of <br />the construction fund from its inception through December 31, <br />1984. <br /> <br />gl <br /> <br />Encls: Table 1 <br />~~e 2 <br />Project Summaries <br />Bauer No. 1 Reservoir <br />Beaver Park Water <br />Grandview Siphon <br />Florida Farm Irrigation <br />Louisville Reservoir <br />San Miguel WCD, Phase I <br />(Lone Cone Reservoir) <br />North poudre Reservoir No. 15 <br />San Miguel WCD, Phase II <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.