My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00073
CWCB
>
Publications
>
Backfile
>
PUB00073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:50 PM
Metadata
Fields
Template:
Publications
Year
1997
Title
Construction Fund Annual Report 1997
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1997
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />BE..' VEl{ rAHK \VA TER CO~IP.-\;\Y - BR!;SIIIIOLLO\\' DA.\1 REII.-\BII.IT.-\ T10:-; <br /> <br /> <br />Stabililed Upstream F:u:e orlhe Brush iloilo\\' Resen:oir Dam <br /> <br />Proiect Description <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />This project was the rehabilitation oflhe Brush Hollow Reservoir in Fremont County. The <br />Woodward.Clyde designed project commenced construction in November 1996 by Tezak Heavy <br />EqUipment Company of Canon City. The project included the stabilization of the upstream dam <br />face and the replacement of the outlet structure. This work consisted of the construction of a new <br />concrete intake structure. a new gate control house and an extension of the 36 inch diameter steel <br />outlet pipe. Additionally. the outlet pipe required lining due to extensive corrosion which was <br />encountered during construction. The project was completed June 30. 1997. <br /> <br />Proiect Data <br /> <br />Sponsor: Beaver Park Water Company <br /> <br />Counl)': Fremont <br /> <br />River: Brush Hollow Creek <br /> <br />Terms of Loan: 5975,OOO@ 3.5% for 30)TS <br /> <br />Substantial Complelion l)ate:June 30. 1997 <br /> <br />Design Engineer: Woodward-Clyde Consultants. Denver. Colorado <br /> <br />Construction Contr3clor: Tezak Heavy Equipment Company, Inc. - Canon Cit~,. Colorado <br /> <br />l)esign Criteria: <br /> <br />Dam Height ~ 75 II. <br />Crest Elevation = 5.5Q..l.j <br />Reservoir Capaclty = -l.t:!5 ac.ft. <br /> <br />I <br /> <br />Annual \"olume of \\"aler Delivered by the Project: -l.1:!5 ac.tl. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.