Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />BE..' VEl{ rAHK \VA TER CO~IP.-\;\Y - BR!;SIIIIOLLO\\' DA.\1 REII.-\BII.IT.-\ T10:-; <br /> <br /> <br />Stabililed Upstream F:u:e orlhe Brush iloilo\\' Resen:oir Dam <br /> <br />Proiect Description <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />This project was the rehabilitation oflhe Brush Hollow Reservoir in Fremont County. The <br />Woodward.Clyde designed project commenced construction in November 1996 by Tezak Heavy <br />EqUipment Company of Canon City. The project included the stabilization of the upstream dam <br />face and the replacement of the outlet structure. This work consisted of the construction of a new <br />concrete intake structure. a new gate control house and an extension of the 36 inch diameter steel <br />outlet pipe. Additionally. the outlet pipe required lining due to extensive corrosion which was <br />encountered during construction. The project was completed June 30. 1997. <br /> <br />Proiect Data <br /> <br />Sponsor: Beaver Park Water Company <br /> <br />Counl)': Fremont <br /> <br />River: Brush Hollow Creek <br /> <br />Terms of Loan: 5975,OOO@ 3.5% for 30)TS <br /> <br />Substantial Complelion l)ate:June 30. 1997 <br /> <br />Design Engineer: Woodward-Clyde Consultants. Denver. Colorado <br /> <br />Construction Contr3clor: Tezak Heavy Equipment Company, Inc. - Canon Cit~,. Colorado <br /> <br />l)esign Criteria: <br /> <br />Dam Height ~ 75 II. <br />Crest Elevation = 5.5Q..l.j <br />Reservoir Capaclty = -l.t:!5 ac.ft. <br /> <br />I <br /> <br />Annual \"olume of \\"aler Delivered by the Project: -l.1:!5 ac.tl. <br /> <br />I <br />