Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.5 Loan Disbursements <br /> <br />A total of $9.40 million in disbursements from the Construction Fund \\"ere made for <br />construction projects, non-reimbursable projects, and investigations in the calendar months of FY <br />97. The following bar chart shows disbursements on a monthly basis. <br /> <br />CWCS Construction Fund <br />Disbursements in FY 1996-97 <br /> <br /> 2.0 <br /> , 8 - <br /> 18 <br /> 1 4 <br /> , 2 <br /><I> <br />c <br />.Q 10 <br />~ <br /> 0.8 <br /> 06 <br /> <br /> <br />T atal Disbursed <br />$9,402.11 8.50 <br /> <br />04 ---- <br /> <br />02 <br /> <br />00 <br /> <br />~ ~ ~ ~ N~ ~ Jan ~ M~ ~ M~ ~ <br />Calendar Month <br /> <br />3.6 Completed Construction Project Loans <br /> <br />The eWeB Construction Fund \\/as established by the General Assembly in 1971 to provide low <br />interest. long-ternl loans to water users for the development of water projects. The tirst project was <br />completed in 1977. By the end ofFY9,. the fund provided over S118.7 million in loan Iinancing <br />for 159 water projects. A list of the completed projects linanced lhrough loans from the <br />Construction Fund is shown in Appendix A. <br /> <br />eweB FY97 Annual Repon, page 19 <br />