My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00073
CWCB
>
Publications
>
Backfile
>
PUB00073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:50 PM
Metadata
Fields
Template:
Publications
Year
1997
Title
Construction Fund Annual Report 1997
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1997
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.6 Small Project Loan Account <br /> <br />In 1994 through SB94-029, the General Assembly created the Small Project Loan Account. A <br />total of $2.0 million was set aside for loans of$100,000 or less. The CWCB was empowered to <br />authorize these 10ans at any time during the year without waiting to submit these projects for General <br />Assembly approval during the legislative session. <br /> <br />The Board approved 5 Small Project Account loans in FY 96, 5 Small Projects Account loans <br /> in FY 97, and 1 Small Project Account loan in FY 98 totaling $746,700. However, the total amount <br /> actually under contract was less, or $675,000 as listed below. A balance of$712,836 was reported <br /> by COFRS to be in the account on June 30,1997. <br />Date Approved Contract <br />A pprnved BnrrnwerlRmereency County Amount Amonnt <br />Jul1995 Caryl R. Carroll - Rio Blanco $ 25,000 $ 25,000 <br /> D&D Wise Dam Rehab. (Additional) <br />Jan 1996 The Pagosa Springs Pipeline Co. - Archuleta 60,000 0 <br /> Raw Geothennal Water Pipeline <br />Jan 1996 South Platte Ditch Company - Logan 100,000 100,000 <br />- -- -- - Diversion Structure Rehabilitation <br />Mar 1996 Bravo Ditch Company - Logan 51,700 40,000 <br /> Diversion Structure Rehabilitation <br />May 1996 Tremont Mutual Ditch Company - Morgan 45,000 45,000 <br /> Diversion Structure Rehabilitation <br />Sep 1996 Decker Lateral Company - Weld 100,000 100,000 <br /> Decker Lateral Lining Project <br />Nov 1996 Excelsior Irrigating Company - Pueblo 100,000 100,000 <br /> Ditch Rehabilitation <br />Mar 1997 Cotton Creek Water Company - Saguache 100,000 100,000 <br /> Airline Ditch Rehabilitation <br />Mar 1997 Fanners Independent Ditch - Weld 55,000 55,000 <br /> Ditch Rehabilitation <br />May 1997 Chipperfield Lane Ditch - Garfield 60,000 60,000 <br /> Rehab Headgate and Pipeline <br />Jul 1997 Smith Irrigation Ditch - Routt 50,000 50,000 <br /> Diversion Dam Replacement <br /> -------. --- <br /> Totals $746,700 $ 675,000 <br /> <br />CWCB FY97 Annual Report, page 10 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.