My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Report of the State Auditor 1993
CWCB
>
Publications
>
Backfile
>
Report of the State Auditor 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:49 PM
Metadata
Fields
Template:
Publications
Year
1993
Title
CWCB CF Performance Audit Report of the State Auditor February 1993
CWCB Section
Finance
Author
State Auditor
Description
Performance Audit February 1993
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />26 <br /> <br />Water Conservation Board Construction Fund Performance Audit-February 1993 <br /> <br />We reviewed the files of some recently completed projects between 1982 and July <br />1992. The Board charged 5 percent interest on these loans. We applied the <br />Board's interest rate of 5 percent to the cash advances, using a simple interest <br />calculation. Therefore, .the lost interest does not reflect the higher market rate of <br />interest. If it did. the amount of interest lost would be greater. The following <br />table shows the lost interest during the construction phase of three projects. <br /> <br />LOAN CONTRACT AMOUNT OF NUMBER CONSTRUCTION LOST <br /># DATE LOAN OF PERIOD IN INTEREST <br /> DRA WS ' MONTHS <br />1 2/2 7 /90 5330,666 10 18 $ 12,777 <br />2 4/16/90 5214.537 2 13 $ 1,724 <br />3 7/24/91 53 10.000 1 4 $ 1,267 <br />Total 5855,203 Total Lost Interest $ 15,768 <br /> <br />As the table indicates, the Board lost over $15,000 <br />during the construction phase of the three projects. <br />This practice results in an additional subsidy to the <br />borrower. Also, this means there was less money <br />available to fund other, projects. Based on <br />discussions with some Board members, we believe this practice may have been <br />inadvertently overlooked. <br /> <br />This practice results in <br />an additional subsidy <br />to the borrower. <br /> <br />Recommendation No. 4 <br /> <br />The Board should charge interest on cash disbursements made to project sponsors <br />during the construction phase of projects. Interest charges could be added to the <br />principal amount of the loan and financed over the term of the loan. <br /> <br />Colorado Water Conservation Board Response: <br /> <br />Agree. The CWCB's contract guidelines will be revised during the <br />upcoming months to require the payment of interest during construction <br />on future projects recommended by the CWCB for assistance from the <br />Construction Fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.