Laserfiche WebLink
<br />e <br /> <br />e <br /> <br /> <br />SPILLWAY: The spillway will be sized to pass the 50% PMP. The <br />spillway on the northwest abutment is expected to be moved to the <br />north to accommodate the enlargement. The existing spillway width <br />is expected to be adequate but can be easily widened if necessary. <br /> <br />A concrete cutoff wall perpendicular to the flow of water is <br />included to stabilize the spillway section. The wall would be <br />about 2 feet thick, at least 2 feet below the ground surface at any <br />point along the wall, and be the desired shape of the spillway <br />cross section. <br /> <br />prospect Dam <br /> <br />8 <br />