My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00071
CWCB
>
Publications
>
Backfile
>
PUB00071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:45 PM
Metadata
Fields
Template:
Publications
Year
1994
Title
Small Dam Site Reconnaissance Study - Evaluation of Prospect Dam and Reservoir
CWCB Section
Finance
Author
Harris Water Engineering, Inc.
Description
Identify and evaluate dam sites at a recon leval, dam sites to fill a need for raw water storage
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />SAHS KNOB DAM AND RESERVOIR <br /> <br />PLAN DESCRIPTION <br /> <br />Sams Knob Dam and Reservoir would be a new structure located on <br />Snowmass Creek a tributary of the Roaring Fork River. Figure 1 <br />shows the general reservoir location. <br /> <br />The sponsoring entity for the dam and the contact person are: <br /> <br />Snowmass Water and Sanitation District <br />Richard Wall, Manager 923-2056 <br />P.o. Box 5700 <br />Snowmass Village, Colorado 81615 <br /> <br />e <br /> <br />The water would be used for domestic, municipal, irrigation, <br />recreational, industrial and other beneficial purposes in the <br />Snowmass District service area and for snow making at the Snowmass <br />Ski Area. There is also some potential for providing instream flow <br />releases. This reservoir is the only proposed source of <br />significant raw water storage capacity in the snowmass Creek basin <br />for District operations. The water from the reservoir would be <br />diverted into an adjacent drainage where the District' s water <br />treatment plant is located. Diversion of the water to another <br />stream is not popular with the residents in the Snowmass Creek <br />drainage r however the construction of Sam' s Knob Reservoir was <br />contemplated in the 1978 Intergovernmental Agreement which was <br />ratified by the pitkin County Commissioners, the Snowmass Water and <br />Sanitation District Board and the Snowmass Land Company. <br /> <br />The District has had initial engineering plans prepared. The <br />information obtained for the evaluation herein was a 1 inch equals <br />50 foot topographic map with the embankment superimposedr and <br />elevation-area-capacity curve. The District has cursory <br />information on the dam and reservoir, this report is mainly an <br />attempt to bring the project to the forefront so that issues can be <br />resolved and the construction initiated. <br /> <br />This reconnaissance report describes the engineering issues, <br />preliminary designs, and costs of constructing the dam. <br /> <br />Sams Knob Dam <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.