My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00071
CWCB
>
Publications
>
Backfile
>
PUB00071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:45 PM
Metadata
Fields
Template:
Publications
Year
1994
Title
Small Dam Site Reconnaissance Study - Evaluation of Prospect Dam and Reservoir
CWCB Section
Finance
Author
Harris Water Engineering, Inc.
Description
Identify and evaluate dam sites at a recon leval, dam sites to fill a need for raw water storage
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />PROSPECT DAM AND RESERVOIR <br /> <br />PLAN DESCRIPTION <br /> <br />Prospect Dam and Reservoir is an existing structure located on a <br />small creek in the South Platte River drainage about 6 miles <br />southeast of the Town of Hudson. Figure 1 shows the reservoir <br />relative to Denver and the Town of Hudson. Figure 2 is a copy of <br />a USGS Quad map showing the reservoir site. <br /> <br />The Dam owner and contact is: <br /> <br />Henrylyn Irrigation District <br />Lawrence (Butch) Gerkin, Manager <br />P.O. Box 85 <br />Hudson, Colorado 80642 <br /> <br />536-4702 <br /> <br />The dam was constructed in the early part of the century and is <br />currently under a small restriction (1.5 feet) by the Colorado <br />State Engineer. <br /> <br />The plan is to enlarge the dam from a present capacity of about <br />6,000 acre-feet to about 9,700 acre-feet. The Henrylyn Ditch which <br />fills the reservoir has a drop into the reservoir of about 8 feet, <br />the enlargement would make use of the reservoir capacity presently <br />unused by that 8 feet of drop. <br /> <br />This reconnaissance report describes the engineering issues, <br />construction, and costs of enlargement of the dam. The designs <br />described herein are preliminary based upon available information <br />and will likely change as detailed data and analysis are developed. <br /> <br />Prospect Dam <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.