My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00071
CWCB
>
Publications
>
Backfile
>
PUB00071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:13:45 PM
Metadata
Fields
Template:
Publications
Year
1994
Title
Small Dam Site Reconnaissance Study - Evaluation of Prospect Dam and Reservoir
CWCB Section
Finance
Author
Harris Water Engineering, Inc.
Description
Identify and evaluate dam sites at a recon leval, dam sites to fill a need for raw water storage
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />RED MESA RESERVOIR <br /> <br />PLAN DESCRIPTION <br /> <br />Red Mesa Reservoir is an existing reservoir located in the LaPlata <br />River drainage in southwest Colorado, about 20 miles southwest of <br />the City of Durango. The reservoir is located on Hay Gulch, a <br />tributary to the LaPlata River. Figure 1 shows the general <br />reservoir location, Figure 2 is a copy of a USGS Quad map showing <br />the reservoir site and the lower portion of the drainage basin. <br /> <br />The dam is owned by the Red Mesa Ward Reservoir and Ditch Company <br />(Company). The address and contact person are: <br /> <br />Red Mesa Ward Reservoir and Ditch Company <br />J. Pat Greer, Board Chairman 588-3325 <br />8097 County Road 100 <br />Hesperus, Colorado 81326 <br /> <br />Trent Taylor, Board Vice-Chairman <br />1290 County Road 102 <br />Hesperus, Colorado 81326 <br /> <br />588-3~95 <br /> <br />e <br /> <br />The structure does not have any serious problems that has caused <br />the dam to be restricted by the Colorado State Engineer. The major <br />concerns are: (1) the crest sags in the middle and is about 3 feet <br />lower than the outside edges of the crest, (2) the outlet tower <br />should be removed and a standard gate installed with hydraulic <br />operation from the crest, and (3) the spillway needs to be enlarged <br />to pass the flood from the 50% probable maximum precipitation <br />(PMP) . <br /> <br />The LaPlata River drainage is a water critical basin primarily <br />because of the LaPlata River Compact with the State of New Mexico. <br />The owners of the reservoir would like to enlarge the reservoir for <br />additional irrigation water and to sell water for plans of <br />augmentation required for domestic water usage in the basin. <br /> <br />The drainage basin above the reservoir is a large basin that drains <br />a gently sloping area, covered with pinion, pine, natural grass, <br />and some irrigation. <br /> <br />Enlargement of the dam would provide about 2900 acre-feet of <br />additional storage. <br /> <br />This reconnaissance report describes the <br />preliminary embankment design, and estimated <br />enlarging the Red Mesa Dam. <br /> <br />engineering issues, <br />construction costs of <br /> <br />Red Mesa Dam <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.