Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Watcr Projcct Construction Loan Program - Projcct Dala <br /> <br />Borrower: <br /> <br />Windsor Reservoir and Canal Company <br /> <br />Pmject Name: <br /> <br />Dam and Canal Rehabilitation Program <br />Phase I - Poudre Valley Canal and Cobb Lak.e Pipeline <br /> <br />Count)': <br /> <br />LarimerfWcld <br /> <br />DraiDa~e Basin: Cache la Poudre River <br /> <br />Total Project Cost: <br /> <br />S t .602.380 <br /> <br />Sources: CWeB <br /> <br />T)'pe of Borrower: <br /> <br />Agricultural <br /> <br />Median lIousehold Income: Between 80010 and 110% <br /> <br />CWCB Loan: <br /> <br />S 1.202.000 <br /> <br />Interest Rate: 4.15% <br /> <br />Turn" 30 years <br /> <br />Proposed Collatent.l: Physical assets associated with the Poudre Valley Canal and Cobb Lake and the <br />stream of revenue from waler customers <br /> <br />Feasibilit), Stud)': Completed August 4, 1995 <br /> <br />Engin('er: Smith Geotechnical of Ft. Collins <br /> <br />Annual Volume of Water l>e1hrered b)'the P.-ojccl: 10.500 acre-feet in saved losses <br /> <br /> <br />. " <br /> <br />! '- 11.5 ~=r--I <br />"7 u, <br />"'!'. I <br /> <br />~i <br />~r ~ <br />;tf.,o-:\ <br />, <br />