Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Projcct Construction Loan Program - Projcct Data <br /> <br />Borrower: <br /> <br />Town of New Castle <br /> <br />Project Name: <br /> <br />Raw Water Pipeline Rehabilitation <br /> <br />County: <br /> <br />Garfield <br /> <br />Drainage Basin: East Elk Creek <br /> <br />Total Project Cost: <br /> <br />$ 355.000 <br /> <br />Sources: To\\'T1. CWR&PDA, eWeR <br /> <br />T)'pc of Borrower: <br /> <br />Municipal <br /> <br />Median Housebold Income: Between 80% and 110% <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CWCB Loan: <br /> <br />$ 266.500 <br /> <br />Jolcr-est Rate: 5.25% <br /> <br />Term" 30 years <br /> <br />Proposed Collateral: Land and stream of revenue from water customers <br /> <br />Feasibilil)' Slud)": In progress <br /> <br />Engineer: SGM Engineers & Surveyors of Glenwood Springs <br /> <br />Anoual Volume of Water Helin'red h)' the Project: 4.517 acre-feet <br /> <br /> <br />; ',.-] <br />. ;"" <br />,~--- - \ <br />';'::'Q ) <br /> <br />, -, <br />. <br />r <br /> <br />, <br /> <br />-.:.:.- <br /> <br />~.CIOU. <br />