Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Waler Project Construction Loan Program - Project Data <br /> <br />Borrower: <br /> <br />I'rojt.'ct Name; <br /> <br />COUDty: <br /> <br />Total Project Cost: <br /> <br />T)'pe of BOl'"rower: <br /> <br />CWCB Loan: <br /> <br />Proposed Collateral: <br /> <br />Feasibility Stud}': <br /> <br />Engineer; <br /> <br />Town of Georgetown <br /> <br />Purchase Water Rights <br /> <br />Clear Creek <br /> <br />nraiDa~e Basin: Clear Creek <br /> <br />Sources: Town and eWeR <br /> <br />Median Household Income: Between 80% and 110% <br /> <br />$275,000 <br /> <br />Municipal <br /> <br />S 206,500 <br /> <br />Interest Rate: 5.25% <br /> <br />Term: 30 years <br /> <br />Water shares or rights and stream of revenue from waler rates <br /> <br />In progress <br /> <br />Mclaughlin Water Engineers. Ltd, of Denver <br /> <br />Anoual Volume of Water Dclin'red b)' the Project: 35 acre-feet <br /> <br />