Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Town of Minturn <br /> <br />Project Name: Bolts Lake Dam and Ditch Rehabilitation <br /> <br />County: Eagle Drainage Basin' Eagle River <br /> <br />Tolal Project Cost: $470.000 Sources: Town and eWeB <br /> <br />T)'pe of Borrower: Municipal MediaD Ilouschold Income: Between 80% and 110% <br /> <br />cwen Loan: $ 360,000 Interest Rail': 5.25% Term: 30 years <br /> <br />I'roposed Collateral: Pledge of Water and Sanitation Fund revenues and the project itself <br /> <br />Feasibility Study: Completed August 28. 1995 <br /> <br />Engint'cr: Mclaughlin Water Engineers, Ltd. of Denver <br /> <br />Annual Volume of Water l)t'lh'ered b:r (he Project: 120 acre-feel in a low runoff year <br /> <br />