My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00059
CWCB
>
Publications
>
Backfile
>
PUB00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:45 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Construction Fund Annual Report 1995
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1995
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Town of Minturn <br /> <br />Project Name: Bolts Lake Dam and Ditch Rehabilitation <br /> <br />County: Eagle Drainage Basin' Eagle River <br /> <br />Tolal Project Cost: $470.000 Sources: Town and eWeB <br /> <br />T)'pe of Borrower: Municipal MediaD Ilouschold Income: Between 80% and 110% <br /> <br />cwen Loan: $ 360,000 Interest Rail': 5.25% Term: 30 years <br /> <br />I'roposed Collateral: Pledge of Water and Sanitation Fund revenues and the project itself <br /> <br />Feasibility Study: Completed August 28. 1995 <br /> <br />Engint'cr: Mclaughlin Water Engineers, Ltd. of Denver <br /> <br />Annual Volume of Water l)t'lh'ered b:r (he Project: 120 acre-feel in a low runoff year <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.