My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00059
CWCB
>
Publications
>
Backfile
>
PUB00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:45 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Construction Fund Annual Report 1995
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1995
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CASTLE PI:-;ES :-;ORTH ~IETRO DISTRICT WELL REHABILlTA no:; <br /> <br /> <br />Placement of the \Vell Control Yault <br /> <br />Proiect Descriotion <br /> <br />This emergency well rehabilitation project commenced in April in anticipation of the continued <br />drought conditions at the Castle Pines l\'orth Metropolitan District in Douglas County. The <br />project was delayed due to wet conditions. however was completed in late June. The project <br />consisted of installing a new 500 gpm pump and resetting the pump intake 300 feet deeper to a <br />depth of 1.780 feet in lhe Arapahoe Aquifer. <br /> <br />Proiect Data <br /> <br />Sponsor: Castle Pines North ~letro Dist Count)": Douglas <br /> <br />Source: Arapahoe Aquifer <br /> <br />Terms of Loan: S100.500 @. 5% for 1 year <br /> <br />Subst.ntial Completinn: June 30. 1995 <br /> <br />Desi~n Engineer: Jehn Water Consultants. Inc. - Denver. Colorado <br /> <br />Construction Contractor: AmWest Well & Pump. Inc. - Henderson. Colorado <br /> <br />Design Criteria: <br /> <br />Depth of Pump intake = 1.780 feet <br />Pump Capacity = 500 gpm \\ith 300 HP. ~300 volt motor <br />Installation of Well Control \' ault <br /> <br />Annual Volume of 'Vater Delinrl.'d by the Project: ~87 acre-feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.