Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />REHABlLITATIO~ OF ;o;ORTH POUDRE RESERVOIRS #5 A~D #6 <br /> <br />I <br /> <br />---- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Re-construction of the North Poudre Resen"oir #5 Outlet Tower <br /> <br />Proiect Description <br /> <br />This dam rehabilitation project included the complete reconstruction of the outlet facilities <br />to North Poudre Reservoirs #5 and #6. and the construction of a new Roller Compacted Concrete <br />(RCC) emergency spillway to Reservoir #6. Storage restrictions on both reservoirs due to <br />inadequate spillways and inoperable outlet facilities, were remond by the construction. Both <br />reservoirs are expected to fill this swnmer providing an additional 6.000 acre feet to the Irrigation <br />Company. <br /> <br />Proiect Data <br /> <br />Sponsor: ~orth Poudre Irrigation Company <br /> <br />Counl)": Larimer <br /> <br />Rh:er: Cache la Poudre <br /> <br />Terms of Loan: $1.800.000 @ 2% for 40 years Substantial Completion: June 1. 1995 <br /> <br />Design En2ineer: The Engineering Company & Smith Geotechnical. Inc. - Ft. Collins. Colorado <br /> <br />Conscruction Contractor: Xational Construction Company. Inc. . Boulder. Colorado <br /> <br />Design Criteria: <br /> <br />Outlet Pipes = 48 in. Reinforced Concrete Pipe <br />Comrol Gatcs = 48 in. slope face gate at the inlet structure <br />48 in. vcnical lift gate in the gate house <br />Spillway @ ::6 = 350 ft.. Roller Compacted Concrete crest <br /> <br />Annual Volume of \Vater Delin~red by the Project: 6.000 acre feet removed from restrictions. <br />