My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00059
CWCB
>
Publications
>
Backfile
>
PUB00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:45 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Construction Fund Annual Report 1995
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1995
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Amount Date <br />Project Name Sponsor County Div Loaned Completed <br />Union Avenue Boat Chute Colorado Water Conservation Board Arapahoe 1 1,328,000 OS/21193 <br />Sanchez Dam Repairs, Phase 1 Sanchez Ditch and Reservoir Co. Costilla 3 200,000 07/01/93 <br />Clinton Reservoir (Municipal Portion) Clinton Ditch & Reservoir Company Summit 5 615,000 08/13/93 <br />Clinton Reservoir (Ski Area Note) Clinton Ditch & Reservoir Company Summit 5 4,120,000 08/13/93 <br />Platoro Reservoir Purchase Conejos Water Conservancy District Conejos 3 450,000 10/01/93 <br />Phase II & III Flood Control Project Sedgewick Sands Draw WCD Sedgwick 1 130,027 11/01/93 <br />Elmwood Lateral Ditch Rehabilitation Elmwood Lateral Ditch Company Mesa 5 80,000 09101194 <br />Mountain Home Reservoir Rehabilitation Trinchera Irrigation Company Costilla 3 1,000,000 09/15/94 <br />Summit Reservoir Dam and Ditch Repair Summit Reservoir and Ditch Co. Montezuma 7 33,000 11/01/94 <br />Poudre Valley Canal Slide Repair Windsor Reservoir and Canal Co. Larimer 1 300,000 12/01/94 <br />Rangely Raw Water Intake Rehab. Town of Rangely Rio Blanco 6 34,000 01/10/95 <br />Monument Well No.2 Replacement Town of Monument EIPaso 2 100,000 02/01/95 <br />Alamosa Creek Canals and Laterals Terrace Irrigation Company Conejos 3 1,650,000 04/15/95 <br />Erie Flood Control Levee Town of Erie Weld 1 498,512 05/01/95 <br />Diversion Structure Replacement New Cache La Poudre Irrig. Co. Larimer 1 700,000 05/01/95 <br />Loloff Lateral Ditch Replacement Loloff Lateral Ditch Company Weld 1 71,500 05/01/95 <br />North Poudre Res. 5 & 6 Rehabilitation North Poudre Irrigation Company Larimer 1 1,800,000 06/01195 <br />Lower Hay~Bretherton Ditch Lining Hay-Bretherton Ditch Company Rio Blanco 6 20,000 06/01/95 <br />Well A-3 Rehabilitation Castle Pines North Metro District Douglas 2 100,500 06/30/95 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />TOTAL <br /> <br />125 Projects I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />c=J $76,568,328 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.