My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00059
CWCB
>
Publications
>
Backfile
>
PUB00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:45 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Construction Fund Annual Report 1995
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1995
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Windsor Reservoir and Canal Company <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br /> <br />3.7 Recommended Changes to Previous Authorizations <br /> <br />Morgan County Quality Water District <br /> <br />The Morgan County Quality Water District was authorized in HB95-1155 a loan in the amount <br />of $4, 126,000 for participation in the Northern Colorado Water Conservancy District's Southern <br />Water Supply Pipeline on the condition that their feasibility study be completed. Following a <br />detailed analysis of alternatives, the project was changed to the purchase of the Hay Gulch well <br />field with a CWCB loan in the amount of $3,000,000. Recent negotiations with the owners of <br />the well field were more favorable than in the past. <br /> <br />The amount of the loan to the Windsor Reservoir and Canal Company authorized in HB95- <br />1155 is recommended to be increased by $702,000 for a total appropriation of $1 ,202,000. As <br />a result of the feasibility study made as condition of the original $500,000 appropriation, the <br />company developed a IS-year staged improvement plan for its canals and six reservoirs. This first <br />phase of the project will save losses in a section of the Poudre Valley Canal and the Cobb Lake <br />Pipeline. <br /> <br />South Platte River Urban Corridor Project <br /> <br />The Board recommends approximately $716,000 in residual grant funds originally authorized <br />in 1979 and amended in 1990 for construction of the Chatfield Project Channel Improvement. <br />Reaches I and II, be reallocated as a grant towards state participation in the restoration of the <br />South Platte River cannel through the City of Denver. <br /> <br />CWCB Annual Report, page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.