Laserfiche WebLink
<br />I <br />I 3.4 Projects Completed in FY94-95 <br />I Thirteen construction projects representing $6.4 million in CWCB loans, as shown in the <br /> following table, were completed in FY 94-95. Additional details about these completed projects <br />I are located in Appendix B. <br /> TABLE 3 <br />I Projects Completed in FY 94-95 <br />I Water Loan Date <br />Borrower - Proiect Authoritv County Div Amount Comoleted <br />Elmwood Lateral Ditch Company - SB94-029 Mesa 5 $80,000 09/0 1/94 <br /> Elmwood Lateral Ditch Rehabilitation <br />I Trinchera Irrigation Company - SB92-87 Costilla 3 1,000,000 09/15/94 <br /> Mountain Home Reservoir Rehabilitation <br />I Summit Reservoir and Ditch Co. - Emergency Montezuma 7 33,000 11/01/94 <br /> Summit Reservoir Dam and Ditch Repair Loan <br />I Windsor Reservoir and Canal Co. - Emergency Larimer 300,000 12/01/94 <br /> Poudre Valley Canal Slide Repair Loan <br />I Town of Rangely - Emergency Rio Blanco 6 34,000 01/10/95 <br />Rangely Raw Water Intake Rehabilitation Loan <br />I Town of Monument - SB94-029 EI Paso 2 100,000 02/0 I /95 <br />Monument Well No.2 Replacement <br />I Terrace Irrigation Company - HB91-1006 Conejos 3 1,650,000 04/15/95 <br />Alamosa Creek Canals and Laterals <br />I Town of Erie - SB81-439 Weld 498,512 05/01/95 <br />Erie Flood Control Levee <br />I New Cache La Poudre !rrig. Co. - HB93-1273 Larimer 700,000 05/01/95 <br />Diversion Structure Replacement <br />I Loloff Lateral Ditch Company - HB93-1273 Weld 71,500 05/01/95 <br />Loloff Lateral Ditch Replacement <br /> North Poudre Irrigation Company - SB92-87 Larimer 1 1,800,000 06/01/95 <br />I North Poudre Res. 5 & 6 Rehabilitation <br /> Hay-Bretherton Ditch Company - HB95-1155 Rio Blanco 6 20,000 06/0 I /95 <br />I Lower Hay-Bretherton Ditch Lining <br /> Castle Pines North Metro District - Emergency Douglas 2 100,500 06/30/95 <br />I Well A-3 Rehabilitation Loan -------------- <br /> Total $6,387,512 <br />I CWCB Annual Report, page 17 <br />