My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00059
CWCB
>
Publications
>
Backfile
>
PUB00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:45 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Construction Fund Annual Report 1995
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1995
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />TABLE 2, Audit Recommendations <br /> <br />I <br /> <br />I <br /> <br />Rec. <br />No, Recommendation Summary Progress as of December I, 1995 <br />1 Develop a formal, systematic program or process which Completed. The Board agreed to implement this <br /> provides a loog- and short-term framework for the use of recommendation by 12/93, The Board identified 5 long- <br /> the Construction Fund. This process should include term goals at its January 1993 meeting. The Board attended <br /> developing broad policy statements, establishing goals a retreat in October 1993 to develop a draft Long Range <br /> and implementation plans and developing performance Plan, The Board's Long Range Plan was formally adopted <br /> measures. on September 14, 1994. <br />2 Develop and implement an effective process for 100g- Completed, The Board agreed to implemeDt this <br /> term financial planning of Construction Fund monies. recommendation by 12/93. The Board staff worked with <br /> This process should include establishing long-term DNR accounting to set up a better method of systematically <br /> funding needs, assessing current sources of funds, and reporting revenues. All accounts have been reconciled. A <br /> projecting future funding requirements that may be water user needs survey was completed in July 1993. A <br /> needed to meet long-term goals. Long-Term Financial Projection for the Construction Fund <br /> was completed in December 1993, <br />3 Establish guidelines which include setting loan interest Completed, The Board agreed to partially implement tlljS <br /> rates to reflect market interest rateS. The Guidelines recommendation by 7/93, The Board approved new <br /> should be reflected in the projects that will be authorized "standard" interest rate guidelines at 2 basis points below <br /> during the upcoming legislative session. the then 30-year Treasury Bond rare for 30 years at its May <br /> 6-7, 1993 meeting. A project evaluation matrix is being <br /> used on new projects. <br />4 Charge interest on cash disbursements made to project Completed. The Board agreed to implement this <br /> sponsors during the construction phase of projects. recommeDdation by 12/93. The Board adopted this new <br /> Interest charges could be added to the principal amount policy at its May meeting. The Construction Fund <br /> of the loan and financed over the term of the loan. Guidelines have been revised to reflect the new policy. <br /> Contracts for future construction projects will require <br /> interest during construction. <br />5 Improve Board monitoring of projects by contacting Ongoing. The Board agreed to implement this <br /> project sponsors at least annually to determine if project recommendation by 12/93, Letters are sent in March to the <br /> sponsors plan to go ahead with the projects. Responses sponsors for all authorized but not yet constructed CWCB <br /> should be documented and reported to the General projects. The staff evaluates the status of the project and <br /> Assembly on an annual basis. determines if it should be deauthorized. <br />6 Develop and implement procedures which would recover Completed, The Board agreed to implement this <br /> the Board's share of feasibility study costs for projects recommendation by 10/93. The Board adopted a new <br /> that are not constructed. Alternatives should be policy at its May meeting that stated the Board's <br /> evaluated, induding payback over a period of time. participation in feasibility study costs must generally be <br /> repaid whether the project is constructed or not. The <br /> Guidelines have been revised to reflect this policy. <br />7 Develop methods to demonstrate Board compliance with Completed, The Board agreed to implement this <br /> procedures it has established, including documentation of recommendation by 7/93. A project checklist was prepared <br /> all Board reviews and approvals. by staff in July 1993. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />CWCB Annual Report, page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.