Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Metropolitan Water Supply Investigation <br /> <br />MWSI Results <br /> <br />3.1.6.2. South Metro Sub-Region <br /> <br />Water providers in this sub-region anticipate additional use of their groundwater rights, <br />surface supplies, reuse/augmentation plans and contract deliveries to meet their projected <br />build-out needs. There is no significant unmet need projected for this sub-region, <br />assuming that Denver Basin groundwater will continue to be used as a major water <br />supply source. <br /> <br />However, the sub-region is actively working to increase the renewable portion of its <br />water supplies by employing effluent management approaches that would maximize the <br />reuse of its groundwater return flows, and by acquiring additional surface supplies. The <br />region is particularly interested in expanding the roles of reuse and conjunctive use of <br />surface and groundwater as ways to reduce its future use of Denver Basin groundwater. <br /> <br />3.1.6.3. City of Aurora <br /> <br />Aurora has not yet projected an ultimate or build-out demand for its service area, Instead, <br />Aurora anticipates future growth to average 50,000 people per decade with an associated <br />increase in water demands of 10,000 acre-feet per decade. Aurora therefore projects a <br />future water demand of 95,000 acre-feet by the year 2030, which includes a 10,000 acre- <br />foot planning reserve. Aurora has plans in place to meet its projected year 2010 <br />demands with acquired Arkansas basin agricultural rights, additional effluent reuse, <br />rehabilitation of its Cherry Creek alluvial wells, and other minor projects, <br /> <br />Aurora's plans for meeting its needs beyond the year 2010 include the Eagle River <br />Conjunctive Use Project (in cooperation with the City of Colorado Springs), the South <br />Park Conjunctive Use Project, and additional water reuse. Aurora is participating in <br />cooperative planning activities of effluent management in the Northeast Metro sub-region <br />described below. Aurora is also working with Denver Water to explore cooperative <br />opportunities involving those entities' existing South Platte reservoirs. <br /> <br />3.1.6.4. Northeast Metro Sub-Region <br /> <br />The long-tenn future water demands for this sub-region are projected to be about 120,000 <br />acre-feet per year. Most of this demand is associated with the City of Thornton. <br />Providers in this sub-region have plans in place to meet about 100,000 acre-feet of this <br />need. <br /> <br />Current planning efforts are focused on meeting the remaining 20,000 acre-feet of needs <br />for this area, which are primarily associated with anticipated growth in Brighton and the <br />South Adams County Water and Sanitation District. Denver and Aurora are also <br />involved in these planning efforts because portions of their service areas are located in <br />this sub-region. Current planning efforts are focused on development of gravel pit <br />storage facilities, maximizing exchanges and finding potential uses for Aurora's and <br />Denver Water's excess supplies of reusable effluent. Providers in this sub-region are <br /> <br />37 <br /> <br />Prepared for the Colorado Water Conservation Board, Colorado Department of Natural Resources by <br />Hydrosphere Resource Consultants. 1002 Walnut Street, Suite 200. Boulder. CO 80302 <br />