Laserfiche WebLink
<br />Final Draft - Preferred Storage Options Plan <br />Southeastern Colorado Water Conservancy District <br />June 8, 2000 <br /> <br />maintained. However, because these in-stream flows are not legally required, the <br />simulation model was not coded so that these in-stream flows would be met. Based on <br />the simulation results summarized on Figure 3.3, for Wellsville, the recommended in- <br />stream flows are met during 92.3 percent of the months during the simulation. If the <br />USBR were to continue to operate the Project to meet the in-stream flows, the impact on <br />Project and non-Project yield would probably be negligible. <br /> <br />J \PROTECTS\99061\ReportS\Prefnred SOP Final wpd <br /> <br />3-21 <br /> <br />m GEl Consultants, Inc. <br />