Laserfiche WebLink
<br />Final Draft - Preferred Storage Options Plan <br />Southeastern Colorado Water Conservancy District <br />June 8, 2000 <br /> <br />Monitorin'{ of Water Quality Imvacts <br /> <br />A major concern of the irrigators and municipalities in the Lower Basin has been, and <br />continues to be, declining water quality primarily relating to elevated levels of total <br />dissolved solids (salinity). Water exchanges, while operated to avoid injury relative to <br />water quantity, are perceived to contribute to declining water quality in the Lower Basin. <br />Despite the apparent lack of negative impacts on water quality (see Section 4.2), <br />implementation of Fry-Ark Project re-operation, and/or any of the other storage options, <br />should include a program of intensive water quality data collection and evaluation. This <br />program should begin as soon as possible and continue throughout the initial 20 to 30 <br />years of Project operations. This data base would serve to establish a pre-Project baseline <br />and for taking corrective actions if water quality impacts are observed. <br /> <br />Municival Outlet Cavacity at Pueblo Dam <br /> <br />Pueblo Dam includes an outlet for municipal releases to the Pueblo Board of Water <br />Works and for the Arkansas Valley entities east of Pueblo. Currently, releases from <br />Pueblo Reservoir are being made to the river. Pueblo's municipal diversion is located <br />downstream of the dam. The Pueblo Board of Water Works is planning to tap the outlet <br />at the ~':In"I Thp 1"\11tlp.t ".:\1"'1"\ ;n,..h.f'1pc r<::l1"\'::If"';hr f'n,r Q n;1"\"",1;...,,,, tl"\ et'or1r"'" thp. "'::111"", p.nt;tl(3e <br />~ ..~. 'UO........ ........ ................. ............. ...""'................. ........t'.......ILJ .......... .... t'..t-".....u...... LV............... ..aH..., Y.........J .,n.uL.......... <br /> <br />east of Pueblo; however, the pipeline termed the "Valley Pipeline" was authorized but <br />not constructed. Although construction of this Valley Pipeline does not appear feasible <br />at this time, any re-operation of storage in Pueblo Reservoir must not compromise <br />delivery capacity from the dam that would be used to supply the Valley Pipeline. <br /> <br />Other Overational Factors and Cost <br /> <br />The re-operation of Fry-Ark Storage under Scenario B would also include the following <br />provIsIOns: <br /> <br />. Storage of Project water would take precedence over the storage of all <br />non-Project water, including any non-Project water that may be in storage <br />when Project water becomes available. <br /> <br />. All allocations ofre-operation storage will be subject to approval of the <br />District Board, consistent with the Allocation Principles and Operation <br />Policies of the District. <br /> <br />. There will be a cost associated with use of the re-operated storage space <br />to be borne by the participating entities. <br /> <br />tI> GEl Consultants, Inc. <br /> <br />3-8 <br /> <br />J-\PR01ECTS\9906I\Repom\Preferred SOP Final wpd <br />