Laserfiche WebLink
<br />Final Draft - Preferred Storage Options Plan <br />Southeastern Colorado Water Conservancy District <br />June 8, 2000 <br /> <br />Individual <br /> <br />Organization <br /> <br />Edith M. Seppi <br /> <br />Lake County <br />SECWCD (Staff) <br /> <br />Tom Simpson <br />Tom Thomas <br /> <br />Trout Unlimited <br /> <br />Orville Tomky <br /> <br />SECWCD <br /> <br />Manuel Torrez <br /> <br />Fort Lyon Canal <br />Coop. Extension <br />Catlin Canal <br /> <br />James Valliant <br /> <br />Wayne Whittaker <br />Ron Woolsey <br /> <br />Fountain <br /> <br />1.2.4 Consulting Services <br /> <br />Consulting engineering and environmental services were provided on the Phase II PSOP <br />by consultants contracted to the Enterprise and CSU. The consulting firms and their <br />responsibilities are sununarized below: <br /> <br />Consultants Retained by Enterprise <br /> <br />GEl Consultants <br />(Lead-Dick Westmore) <br /> <br />Responsibilities <br /> <br />Preparation of PSOP Report, participation on <br />Modeling Subcommittee, identification/evaluation <br />of non-structural measures, advice to District staff <br />during Phase II. <br /> <br />Black & Veatch <br />(Lead-David Egger) <br /> <br />Review of Pueblo Reservoir Enlargement study and <br />cost estimates prepared by the Bureau of <br />Reclamation <br /> <br />Consultants Retained by <br />CSU <br /> <br />Responsibilities <br /> <br />Lead firm for technical evaluations of storage <br />options managing work of subconsultants identified <br />below. Primarily responsible for hydrologic <br />modeling, water quality studies, and <br />regulatory/permitting issues identification. <br /> <br />Montgomery Watson (MW) <br />(Lead-Lloyd Gronning) <br /> <br />J'\PROJECTS\~I\Rep0rt3\Prefcrrcd SOP FiRaI wpd <br /> <br />1-7 <br /> <br /><P. GEl Consultants, Inc. <br />