My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00045
CWCB
>
Publications
>
Backfile
>
PUB00045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 10:11:06 AM
Creation date
9/30/2006 10:09:37 PM
Metadata
Fields
Template:
Publications
Year
1994
Title
Fort Lyon Canal Company Water Transfer Alternatives Study, Final Report
Author
Gronning Engineering
Description
Fort Lyon Canal Company Water Transfer Alternatives Study, Final Report
Publications - Doc Type
Tech Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I Table 3.2 Horse Creek Reservoir Water Rights I <br /> 1. Priorities for its original construction (11,400 acre-feet) are: <br /> Priority Date Flow Rate Source . <br /> August 14, 1900 2,000 cfs Horse Creek <br /> January 25 1906 840 cfs Arkansas River <br /> March 1, 1910 1,466 cfs Arkansas River <br /> 2. For the first enlargement (15.487 acre-feet), the priorities are: <br /> Priority Date Flow Rate Source <br /> January 25, 1906 840 cfs Arkansas River <br /> December 20,1907 5,000 cfs Horse Creek <br /> March 1, 1910 1,466 cfs Arkansas River <br /> 3. For the second enlargement (1,113 acre-feet): <br /> Priority Date Flow Rate Source <br /> June 12, 1908 5,000 cfs Horse Creek <br /> June 12, 1908 840 cfs Arkansas River <br /> March 1, 1910 1,466 cfs Arkansas River <br /> <br />Adobe Creek Reservoir. Total decreed capacity of 87,000 acre-feet which can be supplied from the <br />Arkansas River through the Ft. Lyon Storage Canal or from Adobe Creek. These rights are <br />presented in Table 3.3. <br /> <br />Table 3.3 Adobe Creek Reservoir Water Rights <br />1. Priorities for its original construction (61,575 acre-feet) are: <br />Priority Date Flow Rate Source <br />January 25, 1906 8,631 cfs Adobe Creek <br />January 25, 1906 840 cfs Arkansas River <br />March 1, 1910 1,466 cfs Arkansas River <br />2. For the first enlargement (25,425 acre-feet), the priorities are: <br />Priority Date Flow Rate Source <br />December 29,1908 8,631 cfs Adobe Creek <br />December 29, 1908 840 cfs Arkansas River <br />March 1, 1910 1,466 cfs Arkansas River <br /> <br />3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.