My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00040
CWCB
>
Publications
>
Backfile
>
PUB00040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 11:01:44 AM
Creation date
9/30/2006 10:08:31 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
2004 Small Project Loan Report
CWCB Section
Finance
Author
CWCB
Description
2004 Small Project Loan Report
Publications - Doc Type
Small Project Loan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br />, -. <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: <br /> <br />Henry Bolen Ditch Company <br /> <br />County: Montezuma <br /> <br />Project Name: Henry Bolen Ditch Pipeline Proj. Project Type: Ditch Piping for Salinity Control <br /> <br />Drainage Basin: Mancos River Water Source: Mancos River <br /> <br />Total Project Cost: $669.500 Funding Sources: NRCS, CWCB <br /> <br />Type of Borrower: Agricultural Average Delivery: 2505 acre-feet <br /> <br />Loan Amount: $128,750 (Initial loan $515.000) Interest Rate: 2.5% <br /> <br />Term: 30 years <br /> <br />The Henry Bolen Ditch Company is a non-profit corporation registered in the State of Colorado in <br />2003. The Company manages the Henry Bolen Ditch for the seven members which own water <br />rights and land served by the ditch. The diversion point is located southwest of the Town of <br />Mancos, The ditch is approximately two and a half miles (13,000 feet) long and carries <br />approximately 13 cfs. The proposed Ditch Pipeline Project wili upgrade the ditch by Installing <br />12,000 feet of ditch pipeline and 2.000 feet of lateral lines to reach member-owned lands. NRCS <br />will provide planning, design and a field engineering services. Proposed funding consists of an <br />initial ioan from CWCS for $515,000 that will be reduced by an NRCS CRB Salinity Control <br />Program grant for $386.250 following project compietion. The remaining $128,750 will become a <br />30-year ewCB Loan. <br /> <br />. - 1"---- ~ .... <br />...;. .......--,.1:" 'i ". .... <br />..-\,_ '.,>1' ~I <br />.J.... .., ~J I" - -, .- <br />-- .- <br />. \ t ,-< - -....." <br />~ Ir.Z~-:;j - <br />> ~:... >~:- <br />, HENRY BOLEN DITCH .". <br />h........1 '"~ "j " <br />,'\ \ ' r <br />'j / <br />, . <br />\. <br />,..:, <br />j,. :..-- <br />-. <br /> <br /> <br />,'\ <br />~- I <br /> <br />'; '~jl MAN~:S <br />l ; , ,":--, <br />',.J ' . ."-" <br />.' : '+ J!{ <br />t.lo(l.;:c---::...:--~ '. .:.} / <br />.... ~'---- <br />\0 ~-' '1".... _ "' ...a;'f.: <br />~.. ./ DIVERSION STRUCTURE at MANCOS RIVER <br /> <br />. . <br /> <br />LOCATION MAP <br />
The URL can be used to link to this page
Your browser does not support the video tag.