Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Guenzi Farms <br />May 24-27, 2004 <br /> <br />Agenda Item 21a . <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Ken, Dave & John Guenzj County: Logan <br /> <br />Project Name: Groundwater Recharge Project Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte Water Source: Wells <br /> <br />Total Project Cost: $368,250 Funding Sources: ewes, Guenzjs <br /> <br />Type of Borrower: Agricultural Aver. Delivery: 2000 acre-feet (consumptive) <br /> <br />ewes Construction Fund Loan: $331,425 <br /> <br />Interest Rate: 2.5% <br /> <br />Term: 30 years <br /> <br />Ken, Dave and John Guenzi own and operate a large group of fanns in Logan County in NE <br />Colorado, consisting of approximately 2600 acres of sprinkler and flood irrigated farm ground. <br />Some of the ground is irrigated with direct flow water and some has reservoir water. All of the land <br />is also irrigated with 31 tributary groundwater wells. with the majority of the land relying solely on <br />the wells. Of the 31 wells 25 are operational at this time. Wells are currently augmented under <br />the Logan Well Users (LWU) plan of operation, to replace depletions during times when there is a <br />-call- on the river by a senior downstream water right. Their wells produce approximately 1510 <br />acre-feet of summer-time depletions and approximately 960 acre-feet of winter-time depletions. <br />The project will consist of purchasing a farm with existing recharge facilities that were previously fed <br />only by the Pwnee Ditch. One new recharge well will be drilled and one existing well rehabilitated. <br />The wells would pump up to a combined maximum rate of 12 ds. This would produce up to 2000 <br />acre-feet annually from the 2 wells. Approximately 2100 feet of 12. PVC and 4500 feet of 21- PVC <br />piping will be installed. The CWCS loan will include only that portion of the farm purchase occupied <br />by the existing recharge ponds (100 acres of pasture with 3 pond areas). <br /> <br />- <br /> <br /> <br />.~. <br />. . <br /> <br />. <br />. .'- <br /> <br />..k-..t'" <br /> <br />..... <br /> <br />I <br />t <br />+' . <br />L. <br />, <br />I <br />.~ 00!I .. <br /> <br />~ <br />I <br />I <br /> <br />.-.-- <br /> <br />Location Map <br /> <br />Page 6 of 6 <br />