Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />1992 ANNUAL REPORT TO TIlE <br />COLORADO GENERAL ASSEMBLY <br />FROM THE <br />COLORADO WATER CONSERVATION BOARD <br />January, 1992 <br /> <br />Introduction <br /> <br />Section 37-60-122 (1)(a), CRS, directs the Colorado Water Conservation Board <br />(Board) to submit an annual report to the General Assembly. The purposes of this <br />annual report are fourfold. <br /> <br />First, section 37-60-122 (1)(a), CRS, directs the Board to report on the proposed <br />facilities which the Board recommends be constructed with moneys appropriated or <br />otherwise credited to the construction fund created pursuant to section 37-60-121 (1), <br />CRS. Section 37-60-122 (1)(a) also directs that the Board's report include suggested <br />priorities for the funding of such proposed facilities. <br /> <br />Second, section 37-60-121 (1)(c), CRS, directs the Board to apprise the General <br />Assembly of the steps taken to comply with the criteria set forth in section 37-60-121 <br />(1)(b), CRS. In consideration of making expenditures from the construction fund, the <br />Board is to be guided by those criteria. <br /> <br />Third, section 37-60-115(4)(d), CRS, requires the Board to report annually on any <br />potential reservoir sites which may be encroached upon by incompatible land uses. The <br />initial dam site inventory for which section 37-60-115(4) calls was completed in 1988. <br /> <br />Finally, this report covers such additional matters concerning the use and status of <br />the construction fund as the Board believes desirable to bring to the attention of the <br />General Assembly. <br /> <br />ACTIVITIES AND ACCOMPLISHMENTS <br /> <br />Towaoc Municipal Water Supply Pipeline: <br /> <br />This pipeline was part of the Colorado Ute Indian Rights Final Settlement <br />Agreement and construction has been completed and the system has now been <br />operational for nearly one year. The only remaining unfinished item on this project is to <br />transfer title of the project from the State to the Ute Indian Tribe and this matter will be <br />accomplished early in 1992. <br />