Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Task 1 was performed in September of 1993. Task 2 was conducted in <br />October of 1993. The design reports were prepared in Task 3 during <br />November and December of 1993. The design reports were sent to the <br />CWCB, the dam safety engineers, and the individual sponsoring <br />entities for review and comment during January of 1994. The final <br />report was completed and submitted to the CWCB and each entity on <br />February 15, 1994. <br /> <br />The following chapters describe the work performed, and the results <br />of the Study. <br /> <br />Small Dam Site Recon. Study 2 <br />