Laserfiche WebLink
<br />_ <br /> <br />_ <br /> <br />_ <br /> <br />The work at Big Battlement is much greater than at Granby i12 so <br />that the schedule for Big Battlement will control the schedule for <br />Granby il2. In short, Granby il2 repairs cannot be economically <br />accomplished,- with present access road, without cooperation from <br />the City; the opposite is not true, the city could proceed with <br />~econstruction of Big Battlement without joint repairs at Granby <br />/H2. <br /> <br />Negotiations are being conducted with the Forest Service to allow <br />the access road to be upgraded to make access easier. The outcome <br />of these discussions will have a major impact on the cost of Big <br />Battlement reconstruction for both mobilization and unit costs. <br /> <br />This reconnaissance report describes the engineering issues, <br />construction, and costs of reconstruction of the dam to its <br />historical water level. Technically the embankment reconstruction <br />is an enlargement because the spillway was lowered in the mid <br />1980's and the plan herein is to have the reservoir water level at <br />the previous water elevation. <br /> <br />Big Battlement Dam <br /> <br />2 <br />